Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 22, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a mixed-use development in Collegeville, Pennsylvania. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of March 22, 2023, the project has been awarded. A timeline for construction has not been confirmed. The project includes, but is not limited to, providing all labor, materials (excluding culvert structure, headwalls and wingwalls) and equipment to complete the removal of the existing culvert, existing endwalls, and existing steel pipe railing, and replacing with a new 20'-0" x 7'-6-3/4" ConSpan 0220 culvert structure and wingwalls (approximately 54.5 LF), rip rap embankment protection, and roadway resurfacing located in Eighth Avenue. The project also involves tree removal and curb, sidewalk, and roadway removal and replacement, as well as storm sewer and sanitary sewer improvements. The project will also include diverting the existing stream around the work area, bypass pumping of the sanitary, installing and maintaining erosion and sediment controls, providing maintenance and protection of traffic and restoration of all areas disturbed during the construction of the project. The proposed structure, headwalls and wingwalls will be bid under separate contract. All installation activities shall be completed by the successful bidder of this construct. Clarification deadline 11/28/2022 12:00 PM *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.
Award
Bridges / Tunnels
$422,677.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2022
January 2, 2023
8th Ave, Collegeville, PA
Related To This Project
Collegeville, PA
Bid Date: Dec 09 2022
Collegeville, PA
--
Collegeville, PA
Bid Date: Oct 15 2019
Collegeville, PA
Bid Date: Nov 10 2020
Collegeville, PA
Bid Date: Mar 29 2022
Collegeville, PA
Bid Date: Feb 14 2022
Collegeville, PA
--
Collegeville, PA
Bid Date: Sep 28 2023
Collegeville, PA
Bid Date: Oct 31 2022
Collegeville, PA
Bid Date: Jan 25 2023
Collegeville, PA
Bid Date: Nov 03 2022
Collegeville, PA
Bid Date: Nov 01 2022
Collegeville, PA
Bid Date: Oct 27 2022
Salisbury Township, PA
Bid Date: Nov 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
