EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 28, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Shamokin, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

This Project will consist of a single contract for the demolition and removal of both the existing primary and secondary digester cover and the reinstallation of compatible replacement equipment.The Specifications and Drawings may be examined at the Owners office or the office of the engineer. No bid will be considered unless it is accompanied by a certified check or Bid Bond in an amount equal to at least ten percent (10%) of the total bid. The Bid Security shall be made payable to the Shamokin-Coal Township Joint Sewer Authority. All Bid Bonds must be accompanied by a Power of Attorney or suitable letter of commitment from a licensed surety company as described in the Instructions to Bidders and Specifications. The contract for work under this Bid will obligate the contractor, and any Subcontractors, to comply with the Pennsylvania Prevailing Wage Act and any other such Federal and State requirements presented in the bid documents. The apparent low bidder shall submit Contract Bonds in the forms prescribed in the Specifications prior to receiving an award in accordance with Public Works Contractor's Bond Law of 1967 of the Commonwealth of Pennsylvania. Bidders must, if requested, submit a compliance report concerning their employment practices and policies in order to maintain their eligibility to receive the award of the contract. The Owner shall award the contract to the lowest responsive and responsible bidder or reject all bids within sixty-five (65) days from the date of the bid opening; and no bidder may withdraw his bid before the expiration of such 65-day period; provided however that if the award is delayed by the required approval of another government agency, the sale of bonds, or the award of a grant or grants, the Owner shall reject all bids or award the contract to the lowest responsible bidder within 120 days from the date of the bid opening, and no bidder may withdraw his bid prior to the expiration of such 120-day period Thirty (30) day extensions of the date for the award may be made by the mutual written consent of the Owner and the lowest responsible bidder. The Owner reserves the right, at its option, to reject any or all bids, to waive any informalities, irregularities, defects, errors or omissions in any or all Bid Proposals, as the Owner may deem in its own discretion to be in its best interest The Work will be substantially completed within 500 days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 60 days after the date when the Contract Times commence to run.

Award

Water / Sewer

$2,595,200.00

Public - City

Renovation

7

8

4

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Carpeting, Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
95
Bidding Soon
1,462
All Active Projects
650
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

March 15, 2023

img_map_placeholder

To Be Determined, Shamokin, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Primary and Secondary Digester Cover Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.