BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Dodge City, Kansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The purpose of this project is to perform capital maintenance work on several streets in the City of Dodges City. The Contractor will be determined by the proposed volume of Mastic crack sealant on the Proposal form. Generally, the type and location of the work is as follows: Mastic Sealant shall be applied to as many streets as possible in a general area of town north of Wyatt Earp Blvd, south of US50 Highway and east of Central Avenue (Maintenance Zone #3). City staff will work with the contractor to prioritize streets to receive mastic. Approved Mastic Sealants: Mastic One Crafco Gap Mastic B Maxwell Products Any option in the Manufacturer's Material Application Instructions in regards to Routing or Milling shall not be required. All project areas receiving patchwork are of sufficient thickness and preclude the need for routing or milling. If during the project, both the contractor and the owner agree that routing or milling is required, it shall be the contractor's responsibility to provide for routing or milling. Dirt and debris generated while preparing the roadway surface for the Mastic shall be swept up by the contractor and removed from the roadway and gutter. Dirt and debris blown or swept onto adjacent sidewalks, driveways, and yards shall be removed by the contractor at the end of each day. The Contractor shall be responsible for all traffic control for the work required, and follow the standard set forth in the MUTCD 2009 manual. Contractor shall have all necessary equipment to perform and complete the Mastic Patchwork Project. All cracks shall be cleaned with high pressure air heat lance before the Mastic is added. All visible cracks shall be cleaned and sealed. Care shall be taken not to allow dust or debris from cleaning to contaminate previously cleaned cracks. All dust and debris blown into driveways and sidewalks shall be cleaned by the contractor. Excessive sealant on the pavement surface will not be allowed. The pavement shall not be wet or damp when applying sealant. Traffic will not be allowed on the new sealant until it is dry enough that it will not track. Intersections or other areas that must carry traffic may require that the sealant be covered with fine sand/powder. *Sealant will not be reheated except as allowed by supplier's instructions. The application of mastic shall follow all the manufacturers recommended procedures. The Contractor shall specify on his Proposal form when he intends to begin work on this project. The Contractor will have 45 calendar days or until July 13th , 2023 to complete the work, whichever is earlier. The City will start counting calendar days on the Contractor's indicated start date. The Contractor is specifically reminded of the liquidated damages provisions found in STANDARD SPECIFICATIONS. Quantities shall be paid for at the contract unit price for each bid item. Payment will be full compensation for furnishing and placing all materials, and for all labor, equipment, tools, and incidentals necessary to complete the work in accordance with these Special Provisions and the STANDARD SPECIFICATIONS for the City of Dodges City Questions concerning the Equal Employment Opportunity, Affirmative Action, or Notification of Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) policies can be addressed to the following: Human Resources City of Dodges City 806 Second Avenue Dodges City, KS 67801 TELE: (620) 225-8100 FAX: (620) 225-8144 All Bidders submitting a proposal shall comply with these policies.

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
5
Bidding Soon
128
All Active Projects
43
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 15, 2022

December 15, 2022

July 13, 2023

img_map_placeholder

Multiple Locations, Dodge City, KS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.