Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, new construction and renovation of a mixed-use development in Eighty Four, Pennsylvania. Completed plans call for the renovation of a municipal facility; for the construction of a 2,674-square-foot, one-story above grade warehouse / distribution facility; and for site work for a warehouse / distribution facility.
Question Deadline 11/28/2023 Phase 3.1 General Construction Revised Rebid Project includes a 2,674 square foot metal building for use by the PennDOT maintenance and operations crew. The project also includes increased parking areas, perimeter site fence, and retaining wall construction; renovations to the existing buildings include correcting floor slopes with a cementitious topping material, electrical upgrades to the security system and access controls, additional doors, and additional plumbing fixtures. Washington County Maintenance Facility - New Storage Building & Improve Maintenance Facility ESTIMATED RANGE: .1 General - $4,000,000 - $5,000,000 .2 HVAC - Under $100,000 .3 Plumbing - $100,000 - $200,000 & .4 Electrical - $1,000,000 - $2,000,000 LIQUIDATED DAMAGES = (.1) $1,250.00 per day, (.2) $60.00 per day, (.3) $100.00 per day & (.4) $100.00 per day. There is no Bid Guaranty required for this Project. Client Agency Requirements - Park in top parking, enter office building through main entrance. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction - ALL BASE BIDS (#1, #2, #3 & #4) SDB = 7% VBE = 3% .2 HVAC Construction - ALL BASE BIDS (#1, #2, #3 & #4) SDB = NA VBE = NA .3 Plumbing Construction - ALL BASE BIDS (#1, #2, #3 & #4) SDB = NA VBE = NA .4 Electrical Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = NA VBE = NA *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PROJECT NO. DGS C-0251-0037 PHASE 003 D.G.S. 251-37 PHASE 3 Project includes a 2,674 square foot metal building for use by the PennDOT maintenance and operations crew. The project also includes increased parking areas, perimeter site fence, and retaining wall construction; renovations to the existing buildings include correcting floor slopes with a cementitious topping material, electrical upgrades to the security system and access controls, additional doors, and additional plumbing fixtures. Bid Results Bid Package Name: DGS C-0251-0037 Phase 3.1 General Construction Section Name: Base Bid 1 TBI Contracting, Inc. 5197000 Section Name: Base Bid 2 TBI Contracting, Inc. 5436000 Section Name: Base Bid 3 TBI Contracting, Inc. 6481457 Section Name: Base Bid 4 TBI Contracting, Inc. 6512454 Bid Package Name: DGS C-0251-0037 Phase 3.2 HVAC Construction Section Name: Base Bid 1 First American Industries, Inc 185000 Section Name: Base Bid 2 First American Industries, Inc 185000 Section Name: Base Bid 3 First American Industries, Inc 360000 Section Name: Base Bid 4 First American Industries, Inc 770000 Bid Package Name: DGS C-0251-0037 Phases 3.3 Plumbing Construction Section Name: Base Bid 1 Vrabel Plumbing Company 219200 Section Name: Base Bid 2 Vrabel Plumbing Company 219200 Section Name: Base Bid 3 Vrabel Plumbing Company 249200 Section Name: Base Bid 4 Vrabel Plumbing Company 249200 Bid Package Name: DGS C-0251-0037 Phases 3.4 Electrical Construction Section Name: Base Bid 1 S.E. Schultz Electric, Inc 737000 Section Name: Base Bid 2 Frankl Electric Inc. 48500 Section Name: Base Bid 3 Frankl Electric Inc. 22500 Section Name: Base Bid 4 Frankl Electric Inc. 23000
Bid Results
Municipal
$26,894,711.00
Public - State/Provincial
New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 6, 2023
February 5, 2024
170 PA-519, Eighty Four, PA
Related To This Project
Eighty Four, PA
Bid Date: Apr 14 2022
Eighty Four, PA
Bid Date: May 10 2022
Eighty Four, PA
Bid Date: Jan 09 2023
Eighty Four, PA
Bid Date: Apr 13 2023
Eighty Four, PA
Bid Date: Mar 28 2024
Canonsburg, PA
Bid Date: Sep 06 2022
Washington, PA
--
Scranton, PA
Bid Date: Oct 28 2022
West Chester, PA
--
Warren, PA
Bid Date: Sep 29 2022
Pittsburgh, PA
Bid Date: Sep 29 2022
West Easton, PA
Bid Date: Oct 28 2022
Murrysville, PA
Bid Date: Oct 04 2021
Stroudsburg, PA
Bid Date: Oct 28 2022
Milford, PA
Bid Date: Sep 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.