BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Aurora, Illinois. Conceptual plans call for site work for a road / highway.

The City of Aurora, Illinois (City) is in need of professional services from a qualified engineering consultant for Phase I Design Engineering Services for the Farnsworth Avenue Traffic Signal Modernization/Resurfacing project. The City will have the option to utilize the same consultant for Phase II Design Engineering that completed the Phase I Study. As a part of the selection process, the interested consultants are required to a Statement of Qualifications (SOQ) to perform the requested work. Attached are: 1. SOQ Requirements and Selection Criteria (page 3-6) 2. Scope of Services (page 7-9) 3. Location Map (page 10) All questions must be received by 4:00 PM (CST) on Monday November 7, 2022. A response to all questions received will be posted on the City's website by 4:00 PM (CST) on Wednesday November 9, 2022. It is the responsibility of the consultant to ensure they have any pertinent documents from the City's website including addendums. The City is issuing six (6) separate Phase I/II Engineering Services QBS for different federally funded projects at the same time. Each project has the same QBS deadlines. The City bid numbers for these projects are QBS 22-100, QBS 22-101, QBS 22-102, QBS 22-103, QBS 22-104 and QBS 22-105. Consultants may submit on multiple projects (no limit), but each of the projects should be a separate email submittal with a single .pdf document attached. While some projects are similar, each project is unique. Consultants may submit the same staff for multiple projects. If consultants submit on multiple projects, the number of projects that the consultant submits on will not affect any individual project scoring. Each project may be reviewed by a team of different City staff. If consultants submit on multiple projects, there will be no need to prioritize which submittals the consultant prefers. A consultant may be selected for multiple projects. The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

$4,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
90
Bidding Soon
1,756
All Active Projects
764
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2023

img_map_placeholder

N Farnsworth Ave, Aurora, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.