Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

The work consisting of renovations to (3) there Modular Buildings, including interior and exterior. All new windows/security screens, finishes, plumbing fixtures, HVAC Heating/Cooling Units, roofing, insulation, lighting, AiPhone, ramps/stairs, signage, and limited site work. The work includes standing-seam metal roof systems, hardie board panels, corrugated metal panels, double hung windows (awning at ADA) with security screens, closed-cell spray insulation, piping replacement, gutters/downspouts, shrubs, concrete/asphalt. Trades included but not limited to: Selective Demolition, Cast-In-Place Concrete, Metal Fabrications, Pipe & Tube Railings, Rough Carpentry, Architectural Wood Casework, Roofing, Insulation, Sprayed Insulation, Weather Barriers, Metal Roof Panels, Roof Specialties & Accessories, Firestopping, Joint Sealants, D/F/H, Access Doors & Frames, Automatic Door Operators, Aluminum Windows, Window Guards – Exterior, Glazing, Louvers, Drywall, Tiling, Acoustical Ceilings, Resilient Flooring, Renovation, Exterior & Interior Painting, Visual Display Boards, Signage, Wall & Corner Guards, FRP Wall Paneling, Protective Wall Covering, Toilet, Bath & Laundry Accessories, Fire Protection Specialties, Installation of Fire Extinguishers & Cabinets, Manual Window Shades, Plumbing, HVAC, Electrical, IP Access Control System, Building Intrusion Detection, Grading, Excavation, Fill, Asphalt & Concrete Paving, Chain Link Fences & Gates, Plants & Site Utilities. CONTRACT PERIOD: Contractor to Achieve Preliminary Acceptance By: 8/14/2023 PAYMENT AND PERFORMANCE BOND: 100% of the Base Contract Price BID BOND: A bid bond in the amount of five percent (5%) of the total Bid price is required. Any questions can be directed to Jen Ostafinski, Category Manager Jaostafinski@cps.edu

Bid Results

Educational

$4,626,000.00

Public - City

Renovation

101

31

69

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Mockups, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Project Record Documents, Demonstration and Training, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Architectural Woodwork, Architectural Wood Casework, Wood Paneling
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Preparation for Re-Roofing, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Siding, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Portland Cement Plastering, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Directories, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Plastic Toilet Compartments, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Storage Specialties, Lockers, Metal Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment, Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Portable Lamps, Lamps, Furnishing Accessories, Clocks, Rugs and Mats, Runners, Furniture, Residential Furniture, Beds
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Equipment, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Diffusers, Registers, and Grilles, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Distributed Communications and Monitoring Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds, Mobile Plant Equipment, Mobile Earth Moving Equipment, Backhoes
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
147
Bidding Soon
2,167
All Active Projects
942
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2022

December 19, 2022

img_map_placeholder

10810 S Avenue H, Chicago, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Jane Addams Elementary School - Modular Renovations

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.