Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and addition to a mixed-use development in Ponca City, Oklahoma. Completed plans call for the addition of a 15,086-square-foot educational facility; for the demolition of a educational facility; educational facility; and for site work for a 95,625-square-foot, three-story above grade educational facility.
For: Classroom Addition at Concert Hall Provisions contained in the State of Oklahoma Public Competitive Bidding Act shall be followed. The Owner reserves the right to waive any informalities and irregularities, and the right to reject any or all bids, and to accept any bid he considers advantageous. No bidder may withdraw his/her bid within 30 days after the date of the bid opening. Bids shall be publicly opened and read aloud and shall remain on file at least forty-eight (48) hours thereafter before a con- tract shall be made and entered into thereon. All in- terested parties are invited to attend. All applicable city, state and federal requirements must be met by the bid proposal and adhered to if the successful bidder obtains the project. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for the opening of bids will not be considered and will be returned unopened. Each bidder must deposit sealed with his/her bid, se- curity in the amount of five percent (5%) and in the form of a cashiers check or a surety bond if the bid is over $50,000. Bid security will be returned to the unsuccessful bidders. Bid Result Bid Package 1-Testing Services - ECS Southwest -16,870 Bid Package 3-Concrete - Major Concrete - 549,000 Bid Package 5A-Structural Steel Material - Clint's Welding - 376,600 Bid Package 5B-Structural Steel Labor - Warrior Steel - 118,300 Bid Package 5C-Structural Steel Complete - Bennett Steel - 496,200 Bid Package 6B-Rough Carpentry/Door & Specialties Installation - Kyler Construction Group - 68,372 Bid Package 7A-Roofing & Canopies - Bloyer & Sons - 257,345 Bid Package 7B-Air Barriers/Sealants/Expansion Control - Bone Dry Waterproofing - 47,575 Bid Package 8A-Steel Doors and Frames-Material - Felix Thompson - 34,912 Bid Package 8B-Wood Doors Material - Piper Weatherford - 45,300 Bid Package 8C-Door Hardware Material - Felix Thompson - 68,988 Bid Package 8D-Glazing - T&C Glass - 36,900 Bid Package 9A-Drywall & Acoustical Ceilings - Higgins Group - 902,900 Bid Package 9B-Tiling & Floor Covering - Bryan's Flooring - 606,037 Bid Package 9C-Painting - Silva Spray Foam - 48,050 Bid Package 10B-Toilet Accessories-Material - YI Specialities - 856 Bid Package 10C-Fire Extinguishers-Material - YI Specialities - 3,256 Bid Package 21-Fire Suppression - Summit Fire & Security - 49,681 Bid Package 22-Plumbing - Jackson Mechanical - 190,970 Bid Package 23-HVAC - Dense Mechanical - 435,204 Bid Package 23B-Mechanical - Kuhn Mechanical - 489,628 Bid Package 26-Electrical/Communications/Fire Alarms/Data - Harmons Electric - 356,246 Bid Package 31-Site Demolition/Earthwork/Storm Drainage - Sober Brothers - 176,705
Bid Results
Educational
$5,375,895.00
Public - City
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2022
January 30, 2023
600 E Grand Ave, Ponca City, OK
Related To This Project
Ponca City, OK
Bid Date: Dec 01 2022
Ponca City, OK
Bid Date: Dec 14 2022
Ponca City, OK
Bid Date: Dec 06 2022
Ponca City, OK
Bid Date: Apr 14 2022
Ponca City, OK
Bid Date: Jan 05 2022
Ponca City, OK
Bid Date: Apr 21 2022
Ponca City, OK
Bid Date: Mar 11 2022
Ponca City, OK
Bid Date: Dec 09 2021
Ponca City, OK
Bid Date: Nov 17 2022
Ponca City, OK
Bid Date: Sep 29 2022
Ponca City, OK
--
Ponca City, OK
Bid Date: Nov 10 2022
Ponca City, OK
Bid Date: Feb 16 2023
Ponca City, OK
Bid Date: Oct 21 2022
Ponca City, OK
Bid Date: Oct 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.