BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Ponca City, Oklahoma. Completed plans call for the renovation of a 231,118-square-foot educational facility.

This project consists of complete replacement and upgrade of the fire alarm system to a voice evacuation system including panels, devices and wiring at the Senior High School on all 3 floors of the Howell, MSB Building, the Fine Arts Building, the Commons, both floors of the Cafeteria Building, both floors of the Anderson Building, both floors of the Old Boys Gym and the Girls Gym and all ancillary spaces and connections of building as shown on drawings. This is a total of 6 buildings ranging from two -three stories. As of January 23, 2023 construction has commenced in December 2022. *This project has been awarded and all trades have been let.

Under Construction

Educational

$31,400,000.00

Public - City

Renovation

47

12

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
36
Bidding Soon
803
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

December 19, 2022

Project location map

927 N 5th St, Ponca City, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.