BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 18, 2023 at 7:00 PM

Updated January 25, 2024

Site work and paving for a bridge / tunnel in Seatac, Washington. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replacement of the existing damaged girder, temporary erosion control, bridge deck demolition, railing, expansion joints, bridge drain and drain pipe, traffic control and other work. Estimated value $1,500,000 - $2,000,000 65 working days. WADOT - SR 518, 24th Avenue S Bridge Girder Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$1,283,800.00

Public - State/Provincial

Paving, Site Work

63

8

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
114
Bidding Soon
1,747
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.