BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Wahpeton, North Dakota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Complete reconstruction of 7th & 8th Street South between Dakota Avenue and Fargo Avenue. Replace curb, sidewalk, edge mill and overlay along 5th Street S. from Dakota Avenue to railroad tracks. Reconstruction of Fargo Avenue from 8th Street to 9th Street. Description of each segment is listed below: 5th Street S. from Dakota Ave. to the railroad tracks: New curb and gutter, subgrade preparation, geotextile fabric, edge drains, aggregate base course, and 5.5 inches of bituminous pavement. Also replace existing 6 inch water main. This watermain has no services off from it, look at funding with water fund. 7th Street S. from Dakota Ave. to Fargo Ave.: New curb and gutter, subgrade preparation, geotextile fabric, edge drains, aggregate base course, and 5.5 inches of bituminous pavement. Extend 6 inch watermain to Fargo Ave. to service Three Rivers Decorating and Snap Fitness. Replace the 8 Inch sanitary sewer Line. 8th St. S. from Dakota Ave. to the railroad tracks: New curb and gutter, subgrade preparation, geotextile fabric, edge drains, aggregate base course, and 5.5 inches of bituminous pavement. Also replace existing 12 inch water main. This watermain has no services off from it, look at funding with water fund. Fargo Ave. from 8th St. to 9th St.: Replace the existing bituminous alley with 15' wide concrete alley. Parking area on south side of alley is planned with crushed concrete to help keep costs down. Consideration should be given to extending storm sewer to Fargo Ave. to pick up additional storm water. Consideration should also be given to extending sanitary sewer from Dakota Ave. to Fargo Ave. for lot development/connection to city sewer and water. Project to be coordinated with project number 510 Dakota Ave. Side Streets Phase 2. The project is included in the city's 2023-2027 capital improvement plan (CIP). As of November 4, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$637,484.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
10
Bidding Soon
101
All Active Projects
42
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2023

img_map_placeholder

Multiple Locations, Wahpeton, ND


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.