BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Wahpeton, North Dakota. Conceptual plans call for the construction of a pre-engineered storage facility.

Construction of a 40x20 chemical storage building with a 40x15 spill slab for storage, mixing, and handling of vector control chemicals and chemicals used by the street department. Building to be sited at the east end of the City Hall parking lot adjacent to the flood storage building. Quote from Comstock Construction 5/16/2022 includes: Included: (materials, labor and equipment) - 40 x 20 steel building with a 40 x 15 spill slab. Not included: - Manipulating any underground utilities. - Site utilities - Caulking Concrete joints - Snow guards or gutters at roof. - Bond or permit - Parking lot paving - Testing, Engineering or Survey. - Underground or above ground holding tanks. EARTHWORK: 1. Strip site. 2. Bring site up 3' (50 x 70 pad) 3. Excavate for new footings and foundation walls. 4. Bring in fill sand at slabs and compact. 5. Backfill foundation (rough grade) CONCRETE: 1. Pour 2' x 1' continuous footings at 20 x 40 foundation and stoops. 2. 4' tall x 8" thick, foundation walls to be poured on top of the footings with #4 rebar at 24" o.c. each way. 3. Interior and exterior slabs to be 6" thick with #4 rebar at 24" o.c. each way. 4. Mountable curb on three sides of the spill slab will be approximately 3' wide and 1' thick MASONRY: 1. 4' high brick veneer around the perimeter of the building. STEEL: 1. 16 pipe bollards at overhead doors and corners of building. 2. Steel gate as shown on plans. INSULATION: 1. Foundation will be covered with 1-1/2" ridged insulation around the perimeter (one side) 2. Wall will be filled with R-27, 8" insulation and be covered with a 6-mil poly vapor barrier. 3. Ceilings will feature an R13, 4" insulation over the purlins and an R25, 8" insulation between the purlins. Covered by 6-mil poly. WALK DOORS: 1. Building will feature three new walk doors. Doors will feature a lockset, weather-strip and vision lite. OVERHEAD DOORS: 1. Two new overhead doors at new addition with electric openers. Doors will be insulated and will have a vision lite at the controller side of the door. PAINTING: 1. Prime and Paint 16 pipe bollards and 3 walk doors and frames. STEEL BUILDING: 1. 40 x 20 building with 12' tall sidewalls with 24 ga. standing seam steel roof. 2. Exterior metal siding will be 26 ga. steel. 3. Interior liner panel will be 28 ga. steel. ELECTRICAL: 1. 2- 200A panels (1-main and 1-off peak) 2. 2-320A meter sockets 3. 5- vapor tight LED lights 4. 1- LED outdoor wall plack. 5. 7-WP wall outlets 6. 3- WP wall switches. 7. 1- Circuit for off peak boiler. 8. Circuit for off peak boiler. Trenching and service wire to existing service. PLUMBING: 1. Tie into future site utilities 5' from the building. 2. 50 gallon electric water heater. 3. Eyewash / shower station 4. 2- hose spigots. 5. 4- floor drains. HVAC 1. 1- Reznor, gas fired unit heater. (only one room in building will be heated). 2. Exhaust vent for heater. 3. Fresh air louver. Respectfully submitted Bruce W. Dockter Comstock Construction Water service line to come off watermain along 4th Street North. Propose to directional drill a 1.5 inch diameter line to building. Estimated cost to extend gas, electric, water and sewer to the new building is $23,000. The project is included in the city's 2023-2027 capital improvement plan (CIP). As of November 4, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Warehouse / Distribution - Pre-Engineered Storage Building

$311,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
8
Bidding Soon
98
All Active Projects
44
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

img_map_placeholder

To Be Determined, Wahpeton, ND

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.