Site work and paving for a road / highway in Wahpeton, North Dakota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Proposed project to connect the Wheatland Road Shared Use Path from 11th Street to 4th Street and eventually Kidder Road. The shared use path would be a 10 ' wide path with 4" of bituminous pavement, and 6" of aggregate. Three options were considered for routing the path. Each option has advantages and disadvantages. Unit costs for the project are estimated at $216 per lineal foot of path, approximately five percent over the Wheatland Road Shared Use Path Cost. Proposed project is compatible with the TAP Grant Program. Below is a description of the three options. Option A proposed route includes extending straight east to 9th Street North. Path to extend south on the west side of 9th Street North. Path would extend east to 4th Street on back side of properties bordering 18th Avenue North. This route has the most advantages. There is existing City ROW between Cenex and Colonial Rental Property. The disadvantage of this route is the pathway crosses the trunk watermain and 21 inch force main. Pathway length is 2,991 lineal feet. Estimated cost is $646,056. Option B proposed route includes new path straight east from 11th Street to back side of Colonial Rental Property, path would then extend south to the mobile home park property and continue east to 9th Street North. The next segment of pathway would extend east to 4th Street on backside of properties bordering 18th Avenue North. The advantage of this option is the route doesn't cover as much of the watermain and force main adjacent to 9th Street North. The disadvantage of this option is it does not provide the most direct route to 4th Street North. Pathway length is 3,169 lineal feet. Estimated cost is $684,504 Option C proposed route includes new path straight east from 11th Street to 9th Street. At 9th Street pathway would continue east between Armory Property and WCCO Property to 4th Street North. This is the most direct route. The disadvantage of this route is the pathway route abuts the WCCO Belting Building. Pathway length is 2,490 lineal feet. Estimated cost is $537,840 All options require an easement from WCCO Belting to extend pathway on their property. Options A and B require an easement from Ottertail Power. Option C would require an easement from Interstate Engineering. This project is in included in the City of Wahpeton FY 2023-2027 Capital Improvement Plan (CIP). As of November 4, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$646,056.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2024
Multiple Locations, Wahpeton, ND
Related To This Project
Wahpeton, ND
--
Wahpeton, ND
--
Wahpeton, ND
--
Wahpeton, ND
--
Wahpeton, ND
--
Wahpeton, ND
Bid Date: Apr 19 2022
Wahpeton, ND
Bid Date: Nov 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.