BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2025 at 8:00 PM

Updated October 25, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Wilsonville, Oregon. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project begins to accumulate funds for grant matching funds for project design, acquisition and construction of the French Prairie Bridge project. Project is included City of Wilsonville FY 2023-2028 Budget CIP. As of October 24, 2025, the city is working to secure construction funding. The design is at 90% and is paused. Although a firm timeline cannot currently be established, construction is not expected to commence prior to first quarter 2028.

Design

Bridges / Tunnels

$1,773,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
89
Bidding Soon
1,099
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2028

Project location map

SW French Prairie Rd, Wilsonville, OR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.