EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 13, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Montvale, New Jersey. Completed plans call for the renovation of a educational facility.

The Project consists of the replacement of existing and installation of new boilers, convectors, mechanical units, piping, plumbing, electrical, building controls, and all other associated work as specified and shown on the drawings. Every bid must be accompanied by a certified check or a bid bond in the amount of 10% of the bid, but not in excess of $20,000.00. All bidders and their subcontractors shall be registered with the New Jersey Department of Labor and Workforce Development, pursuant to the Public Works Contractor Registration Act, N.J.S.A. 34:11-56.48 et seq. All bids must be accompanied by a Certificate issued by the New Jersey Department of Labor and Workforce Development, pursuant to the Public Works Contractor Registration Act as to the Bidder and all subcontractors. All bids must be accompanied by a New Jersey Business Registration Certificate issued by the New Jersey Department of Treasury, Division of Revenue. The Bidder must include with its bid its own Business Registration Certificate and that of all subcontractors. Bidders are required to comply with the requirements of N.J.S.A. 10:2-1 et seq., The Law Against Discrimination and Affirmative Action, N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27-1 et seq. This project is a school facilities project as defined in the Education Facilities Construction and Financing Act, N.J.S.A. 18A:7G-1 et seq. and may be funded in part with grant monies from the New Jersey Schools Development Authority (SDA). All contractors and subcontractors engaged by the Board to work on this project shall agree to be bound by the terms of a Grant Agreement issued by the SDA, which, if applicable, will be available for inspection at the Board office during business hours. This project will be partially funded with federal funds, specifically ESSER grants including the Coronavirus Response and Relief Supplemental Appropriations (CRRSA) Act Grants and the American Rescue Plan (ARP) Act Grants. No bidder who is on the State Treasurers or the Federal Governments List of Debarred, Suspended or Disqualified Bidders shall be eligible to bid on this project. No bid may be withdrawn for a period of sixty days from the opening of the bids. The Montvale Board of Education reserves the right to reject any or all bids and waive any minor informality in the bidding process in accordance with the law if it is in the best interest of the Board of Education. The contract, if awarded, shall be awarded to the lowest responsible bidder whose bid is responsive in all material respects to the bid requirements. No bid shall be deemed accepted until the adoption of a formal resolution by the Montvale Board of Education. All bidders must use and complete all bid forms and must comply with every requirement contained in the instructions and specifications.

Award

Educational

$5,383,460.00

Public - City

Renovation

91

20

4

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Accessories, Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Membrane Roofing, Modified Bituminous Membrane Roofing, Fire and Smoke Protection, Firestopping, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Windows, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Resilient Tile Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Casework
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Ventilators, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
519
Active Projects
296
Bidding Soon
5,246
All Active Projects
2,237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2023

March 20, 2023

img_map_placeholder

53 W Grand Ave, Montvale, NJ


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Mechanical Replacement Project at Memorial Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.