BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Young, Arizona. Contact the soliciting agency for additional information.

Project Name: County 19th St & Ave G, 13 County wide Roadway Segments, County 14th at Avenue 4E, and County 11th at Ave G. Project (TRACS) Number: T0362, T0376, T0377 & T0378 District: Southwest Route/MP: N/A Funding Source: HSIP & County Construction Funding FY: FY 2025 T0362: The proposed project is to install centerline rumble strips on Avenue G from County 19th St to County 11th St (~8 miles) and on County 19th St from Avenue G to Avenue 3E (~9 miles). Total project length is approximately 17 miles. T0376: The scope of the project consists of installation of upgraded six inch thermoplastic pavement markings on 13 roadways within the County. The project length is approximately 98 miles. T0377: The work proposed under this project consists of a new traffic signal and northbound and southbound left turn lanes on Avenue 4E. T0378: The work proposed under this project is the re-alignment of a 90-degree curve at County 11th Street and Avenue G, a westbound right turn lane and northbound left turn lane T0362: The scope of the project is the installation centerline rumble strips on Avenue G from County 19th St to County 11th St and on County 19th St from Avenue G to Avenue 3E. Rumble strips will be six inches wide and installed by grinding. Design should include all work necessary to provide all of the clearances, and roadway survey to show the correct installation of rumble strips. The scope of work also includes: Develop stage design submittals, reports and bid-ready documents; including the plans, specifications and estimates. Deliverables to include Stage III, Stage IV, and Stage V (PS&E). Revised: 10.06.2022 Conduct survey and develop plans from survey data. Utility coordination, no conflict letters, support to ADOT Utility Group in issuing the Utility Clearance. Environmental analysis and technical reports to support ADOT EP in providing the Categorical Exclusion Support to ADOT Right-of-Way section in issuing the Right-of-Way Clearance. Conduct management and administrative task including coordination, meetings, scheduling, comment resolution and responses, etc. T0376: The scope of the project consists of design, construction, and installation of upgraded six inch thermoplastic pavement markings on 13 roadways within the County. Design should include all work necessary to provide all of the clearances, and roadway survey to show the correct installation of pavement markings. The scope of work also includes: Develop stage design submittals, reports and bid-ready documents; including the plans, specifications and estimates. Deliverables to include Stage III, Stage IV, and Stage V (PS&E). Conduct survey and develop plans from survey data. Environmental analysis and technical reports to support ADOT EP in providing the Categorical Exclusion Utility coordination, no conflict letters, support to ADOT Utility Group in issuing the Utility Clearance. Support to ADOT Right-of-Way section in issuing the Right-of-Way Clearance. Conduct management and administrative task including coordination, meetings, scheduling, comment resolution and responses, etc. T0377: The work proposed under this project consists of design and construction of a new traffic signal and northbound and southbound left turn lanes on Avenue 4E. The project will include street lights, signs, vertical curbs, pavement widening, and pavement markings. The scope of work also includes: Develop stage design submittals, reports and bid-ready documents; including the plans, specifications and estimates. Deliverables to include scope of work, Stage II, Stage III, Stage IV, and Stage V (PS&E). Conduct survey and develop plans from survey data. Environmental analysis and technical reports to support ADOT EP in providing the Categorical Exclusion Right of way acquisition and the relocation of irrigation canals and electrical lines. Utility coordination, no conflict letters, support to ADOT Utility Group in issuing the Utility Clearance. Support to ADOT Right-of-Way section in issuing the Right-of-Way Clearance. Conduct management and administrative task including coordination, meetings, scheduling, comment resolution and responses, etc. T0378: The work proposed under this project is to design and construction for the re-alignment of a 90-degree curve at County 11th Street and Avenue G, a westbound right turn lane and northbound left turn lane, paving 5 foot shoulders, and the installation of signs and centerline rumble strips. The scope of work also includes: Develop stage design submittals, reports and bid-ready documents; including the plans, specifications and estimates. Deliverables to include scope of work, Stage II, Stage III, Stage IV, and Stage V (PS&E). Environmental analysis and technical reports to support ADOT EP in providing the Categorical Exclusion Right of way acquisition and the relocation of irrigation canals and electrical lines. Pavement removal, earthwork, new pavement, and pavement markings. Utility coordination, no conflict letters, support to ADOT Utility Group in issuing the Utility Clearance. Support to ADOT Right-of-Way section in issuing the Right-of-Way Clearance. Conduct management and administrative task including coordination, meetings, scheduling, comment resolution and responses, etc. Workfront should be used for all projects. Workfront is the standard scheduling and review program for submittals, and is to be used for reviews and comment resolution. Questions, in Writing, Shall Be Received by Ecs at the Below Email Address Until 3 Business Days Before Soi Due Date at 2:00 P.m. (Arizona Time). No Further Questions Shall Be Accepted After the Time Specified. Final Questions Due: November 9, 2022 at 2:00 P.M. (Arizona Time) SOI Submittal Date: November 14, 2022 at 11:00 A.M. (Arizona Time) Estimated Selection Date: December 2, 2022 The method of contractor selection has not been determined at this time. AZ DOT - RFQ - Project Development On-Call - County 19th St & Ave G, 13 County wide Roadway Segments, County 14th at Avenue 4E, and County 11th at Ave G

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
42
Bidding Soon
979
All Active Projects
434
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 8, 2023

img_map_placeholder

Multiple Locations, Young, AZ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.