Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 1, 2024 at 8:00 PM

Updated April 17, 2025

Site work and new construction of a mixed-use development in Burnaby, British Columbia. Completed plans call for the construction of a 187,164-square-foot, three-story above grade clubhouse / community center; library; and parking garage.

Community Centre spaces: Lobby, atrium, and common spaces; Natatorium accommodating three stainless steel pool tanks and change rooms; Gymnasium accommodating two full sized basketball courts and a running track; Fitness centre; Program rooms (4 multipurpose, 2 active studio, 1 preschool room, 1 party room); Seniors lounge and snooker room; Youth lounge with media and meeting rooms; Indoor play area; Childminding area; Community and teaching kitchen (commercial kitchen) ; Music studios (4 studios); Café; and Staff administration area, additional distributed staff offices, and support spaces. On-site Demolition: Existing Cameron Recreation Centre and Cameron Library and associated site features. Library spaces: Lobby, general collection, and common spaces; Active lounges (2 lounge areas); Maker space; Reading room; Storytelling room; Meeting rooms (5 rooms); and Staff administration area accommodating material handling and support spaces. Building Support Spaces: Washrooms; Mechanical and electrical service rooms; Storage rooms; Janitor rooms and other back of house areas; and Below grade parking. Landscape & Site Works: Civic plaza over below grade parking structure; Site landscape including soft and hard landscape, and fitness/play equipment; Large rain gardens and existing bioswale enhancements; and Offsite street works and upgrades, including the widening of Cameron Street, a new multi-use path, rainwater management areas, and below grade services. TIMELINE: This project was publicly tendered for construction management and construction services (collectively, "Construction Management at Risk") and awarded. Site mobilization in September 2024.

Under Construction

Clubhouse / Community Centers

$267,000,000.00

Public - City

New Construction, Site Work

492

48

4

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
294
Active Projects
129
Bidding Soon
2,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed