BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Burnaby, British Columbia. Completed plans call for the construction of a 187,164-square-foot, three-story above grade clubhouse / community center; library; and parking garage.

Community Centre spaces: Lobby, atrium, and common spaces; Natatorium accommodating three stainless steel pool tanks and change rooms; Gymnasium accommodating two full sized basketball courts and a running track; Fitness centre; Program rooms (4 multipurpose, 2 active studio, 1 preschool room, 1 party room); Seniors lounge and snooker room; Youth lounge with media and meeting rooms; Indoor play area; Childminding area; Community and teaching kitchen (commercial kitchen) ; Music studios (4 studios); Café; and Staff administration area, additional distributed staff offices, and support spaces. On-site Demolition: Existing Cameron Recreation Centre and Cameron Library and associated site features. Library spaces: Lobby, general collection, and common spaces; Active lounges (2 lounge areas); Maker space; Reading room; Storytelling room; Meeting rooms (5 rooms); and Staff administration area accommodating material handling and support spaces. Building Support Spaces: Washrooms; Mechanical and electrical service rooms; Storage rooms; Janitor rooms and other back of house areas; and Below grade parking. Landscape & Site Works: Civic plaza over below grade parking structure; Site landscape including soft and hard landscape, and fitness/play equipment; Large rain gardens and existing bioswale enhancements; and Offsite street works and upgrades, including the widening of Cameron Street, a new multi-use path, rainwater management areas, and below grade services. TIMELINE: This project was publicly tendered for construction management and construction services (collectively, "Construction Management at Risk") and awarded. Site mobilization in September 2024.

Under Construction

Clubhouse / Community Centers

$267,000,000.00

Public - City

New Construction, Site Work

492

48

4

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
42
Bidding Soon
1,566
All Active Projects
632
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

September 30, 2024

img_map_placeholder

9523 Cameron St, Burnaby, BC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.