BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2022 at 7:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in North Bend, Washington. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The bridge deck of the bridge over the Snoqualmie River is showing signs of fatigue. Repair and resurface the existing bridge deck to maintain the structural integrity, continue safe operation of the interstate, and extend the life of the bridge. As of November 10, 2022, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the Third quarter of 2022. The contract advertisement is expected in Fourth quarter of 2022 and construction is anticipated to be operationally complete in the Fourth quarter of 2024. WSDOT - I-90 / S Fork Snoqualmie River Bridge EB - Deck Rehabilitation *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Bridges / Tunnels

$2,398,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
109
Bidding Soon
1,675
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

Project location map

I-90, North Bend, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.