Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Tyler, Texas. Completed plans call for site work for a road / highway; and water / sewer project.
Project Name: Stagecoach Drive Drainage Improvements The project includes: Storm water reroute west on Kingspark Drive and south on Stagecoach Drive using a combination of RCP and box culvert structures. This project will also include pavement restoration, water line relocation, and sanitary sewer point repairs. Forms of proposal, contract, bonds, insurance, plans and specifications may be viewed and downloaded free of charge through website. Any questions/answers or addenda will be managed through website. The deadline to ask questions is 12/09/2022 5:00 PM CST Estimate: $1.5 to $2.0 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. . Storm water reroute west on Kingspark Drive and south on Stagecoach Drive using a combination of RC and box culvert structures. This project will also include pavement restoration, water line relocation, and sanitary sewer point repairs. 1. Anticipated construction start date: January 30, 2023. 2. Anticipated construction completion date: January 30, 2024. 3. City of Tyler work day: 7:00 AM - 6:00 PM, Monday through Friday. 4. Maintenance of work areas in accordance with Section 16.10 of the contract documents. 1. Plans are in review with CenterPoint to work through any possible gas line conflicts. 2. Section 18 Special Specifications a. Items 19 & 20 will include embedment of pipe subsidiary to these item. b. Item 17, Riprap (Concrete) (6 in.) accounts for concrete between the wingwalls per TxDOT Item 466 3. Utility locates / One Call a. Contractor is responsible for locating all existing utilities within scope of work. 4. Layoff space for material/equipment
Bid Results
Water / Sewer
$1,882,991.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 13, 2022
January 30, 2023
Stagecoach Dr, Tyler, TX
Related To This Project
Tyler, TX
--
Tyler, TX
Bid Date: Nov 29 2022
Tyler, TX
Bid Date: Apr 04 2023
Tyler, TX
Bid Date: Jul 31 2023
Tyler, TX
Bid Date: Dec 13 2022
Tyler, TX
Bid Date: Dec 22 2022
Tyler, TX
--
Tyler, TX
--
Tyler, TX
Bid Date: Dec 13 2022
Tyler, TX
--
Tyler, TX
--
Tyler, TX
Bid Date: Nov 03 2022
Tyler, TX
Bid Date: Dec 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.