BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Beckley, West Virginia. Completed plans call for the renovation of a educational facility.

Question Submission Close Date 11/29/2022 12:00 PM EST West Virginia University on behalf of its Board of Governors ("BOG") located in Morgantown, West Virginia ("WVU" or "University") is initiating this Request for Bids ("RFB") from qualified, experienced, and licensed Contractors for the replacement of specific portions/repair of the Innovation Building in Beckley WV. The bid/proposal process is highly controlled. To protect the integrity of the process, any questions or clarifications regarding this Request for Bid/Proposal must be handled through the Department of Procurement, Contracting, & Payment Services. SUBSTANTIAL AND FINAL COMPLETION - The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated below. The date of issuance of the West Virginia University's Notice to Proceed and/or Contact shall be used to calculate Substantial and Final Completion if contract time stated below is in number of calendar days. Project Dates: May 8, 2023 through May 26, 2023 Substantial Completion shall be May 23, 2023 Final Completion shall be May 30, 2023 Final Completion is considered when project site is de-mobilized and all project documents listed in Close-Out section of the specifications has been sent to the owner. LIQUIDATED DAMAGES - The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated above. The date of issuance of the West Virginia University's Notice to Proceed or Executed Agreement shall be used to calculate Substantial and Final Completion of contract time stated in number of consecutive calendar days or established date. Time is of the essence. Liquidated Damages shall be Five Hundred Dollars ($500) per Calendar Day of delay in achieving Substantial Completion and Two Hundred and Fifty Dollars ($250) per Calendar Day of delay in achieving Final Completion. BONDING The following Bonds will be required with award: Performance Bond Labor and Material Bond Maintenance Bond Visitors and Contractors Self-Screening Checklist The safety of West Virginia University's campus community remains our top priority. As the COVID-19 pandemic continues to evolve and spread, WVU is monitoring the situation closely and will periodically update its policies and procedures based on current guidance from the Centers for Disease Control and Prevention (CDC), the World Health Organization and other federal, state and local agencies. To help prevent the spread of COVID-19 and reduce the potential risk of exposure to our employees and visitors, we are conducting a simple screening questionnaire. Your participation is important to help us take precautionary measures to protect you and other members of our campus community. WVU's guidelines for visitors on campus. Contractors and construction workers also should follow the Guidance for the Construction Workforce and other federal, state and local guidelines. Staging and General protection: Contractor shall 1. Provide and maintain all enclosures, fencing of construction areas, interior protection, exterior protection, and ground protection as necessary. a. Interior protection shall be required at all access areas. b. Access is restricted and contractor shall minimize construction traffic. c. Staging area is limited, and access shall be provided to the Parking Garage at all times during the Roof Renovation Project. d. Exterior protection shall be provided for all pedestrian and vehicle traffic. 2. Provide and maintain protection on all roof sections where materials are to be transported over the sections to the designated staging area as necessary

Post-Bid

Educational

$300,000.00

Public - State/Provincial

Renovation

7

20

41

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
25
Bidding Soon
355
All Active Projects
158
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2022

May 10, 2023

img_map_placeholder

282 Minnesota Ave, Beckley, WV


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.