BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2022 at 7:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Scottsville, Kentucky. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This document constitutes a Request for Proposals for a Professional Service Contract from qualified individuals and organizations to furnish those services as described herein for the Commonwealth of Kentucky, Department of Highways. Item No. - 3-80207.00 Project Manager - Stewart Lich, P.E. User Division - Highway Design Approximate Fee - $350,000 Preliminary Engineering & Environmental Services (Lump Sum) Project Funding - STP Funds (Federal Funds) Project Length - Approximately 7.486 miles Improve safety on KY-101 from KY-234 to the Warren County line KY-101 is a rural major collector route that connects the rural communities along the corridor to the cities of Scottsville and Bowling Green. It is also an AAA truck route that is used for the transportation of freight. This section currently experiences 16.4% truck traffic. Locals have expressed concerns about over-dimensioned trucks on this route due to the narrow road width. The purpose of this project is to improve safety along this section of KY-101. The Consultant team shall include a DBE Participation Plan with their Response to Announcement to help the Department meet the 11.95% DBE goal established by FHWA. The plan should demonstrate how DBE companies will be mentored or used to assist in the area(s) pertaining to this contract. Opportunities for firms to be mentored on how to receive DBE and/or prequalification status may be available. An additional page will be allowed in the Project Approach (Section 7) to exhibit this plan. A maximum of four (4) points will be considered in the Evaluation Factors for the DBE Participation Plan. First Selection Meeting: December 5, 2022 Final Selection: December 16, 2022 Pre-Design Conference: January 4, 2022 Consultant Fee Proposal: January 13, 2023 Contract Negotiations: January 25, 2023 Notice to Proceed: February 15, 2023 The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

$300,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
85
Bidding Soon
1,320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2023

Project location map

KY-101, Scottsville, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.