BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Huttonsville, West Virginia. Working plans call for the renovation of a detention facility.

As of December 28, 2022, bids were cancelled. No definite date for the rebid. Vendors may submit questions relating to this Solicitation to the Division of Corrections and Rehabilitation. Questions must be submitted in writing. All questions must be submitted on or before the date listed below and to the address listed below in order to be considered. A written response will be published in a Solicitation addendum if a response is possible and appropriate. Non-written discussions, conversations, or questions and answers regarding this Solicitation are preliminary in nature and are nonbinding. Submitted e-mails should have solicitation number in the subject line. Question Submission Deadline: Submit Questions to: 2:00 PM E.S.T. on December 8, 2022 1409 Greenbrier Street Charleston, WV 25311 Fax: (304) 957-7622 Email: Philip.K.Farley@wv.gov (Email is the preferred method.). ACCEPTANCE/REJECTION: The State may accept or reject any bid in whole, or in part in accordance with W. Va. Code of State Rules 148-1-4.5. and 148-1-6.4.b." Scope- Replacement Windows ( Double hung windows) A. At Huttonsville Correctional Center and Jail, there are fourteen (14) existing windows that are old and must be replaced with vinyl double hung insulated windows inserts. Additional information on the requirements is listed below: B. New vinyl double hung insulated windows: 1. The new windows must be type vinyl. 2. The new windows must have two sperate layers of glass. 3. The new windows must have low E and argon gas in-between the two layers of glass. 4. The new windows must meet the attached specification section 08560, series 200 double hung vinyl windows. 5. If the contractor does not have to provide the specified manufacture in the previously stated specification section 05860, but they must submit their information on the alternate manufacture during the questions and answer period with the documents that show that the product meets or exceeds the specified requirements. C. The contractor is responsible for getting the required measurement for each of the specified windows that must be replaced. The DCR is not responsible for getting the window measurements for the contractor. D. Installation of new windows: 1. The contractor must remove what parts of the existing windows that must be removed to install the new vinyl inserts. 2. The contractor must install the new vinyl window inserts as per what is specified in the manufacturer's installation requirements. 3. The contractor must wrap the exterior of the existing window frames and the new vinyl inserts windows with metal and install caulk. E. The contractor is responsible for disposing all items that are removed to install the new vinyl windows. F. The Contractor shall furnish all materials, labor, and equipment necessary to complete all Construction Services. The Contractor shall furnish any incidental work, materials, labor, and equipment that are necessary to complete the Construction Services, even if such incidental work is not explicitly included in the Project Plans Manual and Contract Drawings. G. Please see the following attachments for pictures of the existing window. 1. Attachment #1: Existing windows H. Contract drawings for reference, Exhibit B: 1. Sketch of existing windows that must be replaced.

Final Planning

Jails / Prisons

$100,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
13
Bidding Soon
245
All Active Projects
99
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2022

January 16, 2023

img_map_placeholder

US-250, Huttonsville, WV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.