Published January 16, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Brighton, Michigan. Completed plans call for site work for a water / sewer project.

The Project consists of water main replacement and water main construction for the multiple locations listed below, in three divisions: Division A: The CC Annex neighborhood water main replacement project. This includes the following streets: Leland Street, Van Winkle Street, Ethel Street, Military Drive, Saunders Street, Clara Jean Street, Burson Drive, and Weber Street. Approximately 14,200 feet of 8-inch water main is proposed for replacement within this subdivision. Division B: The next location is 12-inch Loop starting at the Brighton Area Schools bus yard is approximately 1,000 feet of the total 4,300 feet of newly proposed 12-inch water main needed to complete the redundant loop from behind Kroger to Lee Road. Division C: The final locations include two (2) proposed directional drill installations of 24-inch water main crossings beneath US-23 in two locations: one crossing approximately 2,600 feet north of Lee Road, south of the existing 24-inch water main crossing, and the second proposed crossing approximately 1,200 feet south of Lee Road, south of the existing 24-inch water main crossing. DEPOSIT: 5% of bid amount No bid may be withdrawn for a period of 120 calendar days after the scheduled closing time for receipt of the Bids. This period may be extended by mutual agreement of the Owner and any Bidder or Bidders. The OWNER reserves the right to accept any or all Bids and award the contract to other than the lowest bidder, to waive any irregularities or informalities or both; to reject any or all Bids; and in general to make the award of the Contract in any manner deemed by the OWNER, in its sole discretion, to be in the best interest of the OWNER. The OWNER also reserves the right to award the project based on any combination of Divisions A, B, and C including eliminating any Division. Pre-Bid questions may be directed to rich.hobgood@ohm-advisors.com by 2:00 PM on December 1st, 2022. The bus yard first phase for a water main loop is approximately 1,000 feet of the total 4,300 feet of 12-inch water main needed to complete the redundant loop from Kroger to Lee Road. 213071

Bid Results

Water / Sewer

$6,473,765.00

Public - County

Site Work

54

10

6

10

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
365
Active Projects
224
Bidding Soon
2,570
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2023

May 23, 2023

Project location map

Multiple Locations, Brighton, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.