EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 7, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work, renovation and addition to a mixed-use development in Montgomery, Alabama. Completed plans call for the addition of a 3,300-square-foot, two-story above grade military facility; for the demolition of a military facility; for the renovation of a 1,300-square-foot military facility; and for site work for a water / sewer project.

Contract Award Date: Aug 03, 2023 Contract Award Number: W50S6N-23-C-0003 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: ZN18CLHUHKK4 Contractor Awarded Name: Birmingham Industrial Construction, LLC Contractor Awarded Address: Alabaster, AL 35007 USA Base and All Options Value (Total Contract Value): $5,717,498.00 F-35 Squadron Operations Addition and Alteration; Project Numbers: FAKZ189102. The 187th Fighter Wing intends to aw ard a firm fixed-price contract for services to renovate communication building 1109, as per Specifications and Draw ings Dated 22 Nov 2022. Project Number FAKEnclosureZ189102 w ill include Construction of an approximate 3,300 square foot addition housing the Base's Squadron Operations Functions specific to the F-35. The Magnitude is betw een $1,000,000 and $5,000,000. The North American Industry Classification System (NAICS) for this project is 236220. The Small Business Size Standard is $45,000,000. This aw ard is 100% set aside for Small Business. Provide Construction Services Non-Personal, to include material, labor, supervision, equipment, and supplies to construct an approximate 3,300 square foot addition housing the Base's Squadron Operations Functions specific to the F-35. Within the new addition, special facilities include secure and non-secure office space, storage space, secure storage room and expanded performance element. The renovation scope will be approximately 1,300 square feet of modification to serve the functions specific to the F-35. Within building 1303, special facilities include reconfiguration of non-secure office, training, and storage spaces. Modifications to secure spaces are limited to power, data, and security modifications. One existing non-secure area will be converted into a separate dedicated secure working area. FOB: Destination NOTICE OF PRE-BID CONFERENCE AND SITE VISIT: a. A pre-bid conference will be conducted on 7 March 2023 at 1000 hours Central Time for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at 5187 Selma Highway, Montgomery, Al. 36208-4824 Bldg. 1502 Wing Auditorium. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference. b. Due to security conditions, all offerors must register to attend this conference and site visit. Complete the Entry Authority List (EAL) this is posted with this announcement and email it to stephen.shanks.1@us.af.mil and peter_john.ungacta.1@us.af.mil. c. This information must be provided in advance, 3 business days prior to the meeting, to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government's denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site. d. Visitors must pick up their passes at the Installation's Main Entry Gate prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Driver's License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such. e. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply. f. A record of the conference shall be made and furnished to all prospective bidders via posting at www.SAM.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers. W50S6N23B0003 Page 9 of 77 5. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS: a. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office. Subject Line: Reference No. SOLICITATION W50S6N-23-B-0003 Email: stephen.shanks.1@us.af.mil and peter_john.ungacta.1@us.af.mil All questions and requests for information (RFI) must be received NOT LATER THAN the Tenth working day prior to bid opening. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The scope of work includes but is not limited to the following: Sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical, and mechanical systems for the construction of an addition to Building 1303, on the 187 th Fighter Wing Campus. Project shall include three additive bid options; Option 1 Engine Generator, Option 2 Landscape Furniture and Option 3 Dumpter Concrete and Enclosure.

Award

Military

$5,717,498.00

Public - Federal

Addition, Demolition, Renovation, Site Work

218

47

16

7

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchors, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Metal Roof Panels, Membrane Roofing, Thermoplastic Membrane Roofing, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Maintenance Coatings, Common Work Results for Finishes, Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Plastering, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Storage Specialties, Lockers
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Rugs and Mats
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Concrete Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
32
Bidding Soon
500
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

June 7, 2023

img_map_placeholder

5187 Selma Hwy, Montgomery, AL


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Squadron Operations Building Addition and Alteration

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.