Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Barrington, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
3613.230,26804 Questions will be accepted up to 72 hours in advance of the bid opening time. Any questions received closer to the bid opening will not be answered All bidders will submit along with their respective bid documents, a resume of similar projects performed, enumerated as to location, type of work, approximate completion date, and project engineering firm. Additionally, all bidders will submit a list of equipment owned by, or available to them, for the efficient pursuance of the project. All bidders will submit along with their respective bid documents, a satisfactory progress schedule or critical path schedule which shall show the proposed sequence of work, and how the Contractor proposes to complete the various items of work on or before the completion date specified. Contractor shall work around the individual summer school schedules provided on the plans and listed in the special provisions. Failure to provide a satisfactory progress schedule in the bid package will, at the discretion of the District, be disqualified. WAGES OF EMPLOYEES: Not less than the prevailing rate of wages as found by the Department of Labor or determined by a court on review shall be paid to all laborers, workers and mechanics performing work under this contract. Certified payroll documentation of general contractor's and all sub-contractors' laborers will be required. LOCATION OF THE WORK: Various Schools under School District 220 authority within the Villages of Barrington, Barrington Hills, and South Barrington found in Lake and Cook County. DESCRIPTION OF WORK: Project will include but not limited to: hot-mix asphalt surface and binder courses, HMA pavement patching, PCC sidewalk removal and replacement and additional concrete work, site restoration, minor storm sewer improvements, pavement markings in thermoplastic and paint, crack fill & routing, and other items needed to complete the proposed improvements. This project is to be bid as a lump sum contract with supplemental unit prices. BID SECURITY: Bid security in the form of a Bid Bond or Certified Check for ten percent (10%) of the base bid made payable to the Barrington Community Unit School District 220 shall accompany the bid. CONSTRUCTION SCHEDULE: The Contractor shall begin the work to be performed under the contract after Thursday, June 8, 2023. The Contractor shall be substantially complete by Friday, August 4, 2023 and final completion by Friday, August 11, 2023. Substantial Completion is defined as all improvements except restoration. Final completion is defined as restoration and punch list items. In case of failure to complete the work on time, liquidated damages shall be assessed in accordance with Article 108.09 of the Standard Specifications or other applicable BDE Special Provisions shall apply. Note: a second site contractor may be present at these three sites; Countryside Elementary School, District 220 Administration Building, and Roslyn Road Elementary School. At these three sites the School District recommends that work be completed either before June 16th or after June 19th.
Post-Bid
Sidewalks / Parking Lot
$400,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2022
June 8, 2023
Multiple Locations, Barrington, IL
Related To This Project
Barrington, IL
Bid Date: Jan 20 2023
Barrington, IL
Bid Date: Jan 20 2023
Barrington, IL
Bid Date: Apr 01 2022
Barrington, IL
Bid Date: Mar 29 2022
Barrington, IL
Bid Date: Mar 28 2022
Barrington, IL
Bid Date: May 11 2022
Barrington, IL
Bid Date: May 20 2022
Barrington, IL
Bid Date: Apr 29 2022
Barrington, IL
Bid Date: Oct 25 2022
Barrington, IL
Bid Date: Oct 24 2022
Barrington, IL
Bid Date: Nov 02 2022
Barrington, IL
Bid Date: Nov 01 2022
Barrington, IL
Bid Date: Nov 01 2022
Rockford, IL
--
Removing the Existing Structure and Construction of a New Single Span PPC Deck Beam Bridge - 4904861
Iroquois, IL
Bid Date: Dec 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.