BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 3, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in West Chester, Pennsylvania. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of January 3, 2023, bids were rejected. No definite date for the rebid. A bid bond by acceptable surety or a certified check made payable to Yoe Borough in the amount of 5% of the maximum bid must be provided by each bidder with their bid. Notice is hereby given to bidders that this project is subject to the provisions of the Pennsylvania Prevailing Wage Act approved August 15, 1961 (Act No. 442, P.L. 987), as amended. Yoe Borough Council reserves the right to accept any bid or reject any or all bids. CLARIFICATION DEADLINE 11/28/2022 5:00 PM

Final Planning

Sidewalks / Parking Lot

$127,790.00

Public - City

Paving, Site Work

11

45

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
727
Active Projects
365
Bidding Soon
4,380
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2022

July 3, 2023

Project location map

W Gay St, West Chester, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.