Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in La Junta, Colorado. Completed plans call for the renovation of a educational facility; and fitness / recreation center.
A. Sprinkler System: The building is approximately 42,000 gsf with access/egress available from lower and ground levels. The original construction date was 1952 with a renovation update in 1989. The building is completely void of any fire sprinkler or suppression system. Flow Tests from existing hydrant source indicates that no supplemental pumps will be required to service the needs of this building. B. Emergency Lighting and Exit Paths Emergency Lighting and Exit Paths are dated and do not lend to emergent situations and ease of egress. Handrails and aisle/balcony rails are old and outdated and give concern to liability of smaller attendees falling between rails. Points of egress make security measures limited and design inhibits flow of traffic to move smoothly between entry and exits. Lack of directional egress and pathways to and from stairways from upper seating make emergency evacuations of those areas confusing and hazardous. Old wooden doorways and directional egress and pathways into and out of main floor have latching issues and makes it difficult to control entering or exiting crowds through direction and door accessibility. Bottlenecks in main entry through Ticket area lends to congestion in emergent situations. Each Bid shall be submitted on the required Bid Form and must be accompanied by a Bid Bond on State Buildings Programs Bid Bond Form SC-6.14 in an amount not less than 5% of the total Bid. The Bid Bond may also be (1) a cashier's check or (2) a certified check made payable to the Treasurer of the State of Colorado in an amount not less than 5% of the total Bid. The Bid Bond is submitted as a guaranty that the Bid will be maintained in full force and effect for a period of thirty (30) days after the opening of the Bids for the project. The Bidder promises, in submitting his Bid, that if issued a Notice of Award, they will, within the prescribed time, execute the required Agreement, furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance, or forfeit his Bid Guaranty as Liquidated Damages. Scope of Services Coordination - Subcontractors Subcontractors on the job shall: A. Use as resources: his best experience, knowledge, skills, and craftsmanship for the execution of his work. 1. Use his knowledge of code requirements and comply with codes; 2. Anticipate the Owners maintenance requirements and make convenience and access a high priority. B. Understand: the functional intent of his product in the total building concept and provide that function. C. Use his best: abilities and craftsmanship to produce quality work that is functional and trouble free for the Owner. D. Cooperate: with the General Contractors superintendent in coordinating their work with other trades. Subcontractors shall make adjustments and modifications to his work to accommodate the work of others and to best fit the total building concept, function, and use. Construction Superintendent A. A qualified construction superintendent: acceptable to the Owner and the Architect shall be assigned full-time to the project for the duration of the work. IN ADDITION TO OTHER DUTIES, THE CONSTRUCTION SUPERINTENDENT SHALL: B. Understand: the total building concept and the function of the various parts, products, and systems in the project. He shall assist subcontractors in interpreting the plans and specifications correctly. C. Understand: and coordinate the sequence of construction so that proper sequence precludes the possibility of one subcontractors work causing damage to the materials and equipment of another subcontractor or limiting intended function. D. Prepare: for the work of the various trades and subcontractors. 1. Review the contract requirements with the subcontractors. Resolve any misunderstandings. 2. Review substrate conditions with the subcontractor over which his work is to be applied or attached. 3. Correct any unacceptable conditions that preclude proper installation or function before proceeding. E. Supervise: the execution of the subcontractors work. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law. Per C.R.S. 24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. Mandatory Pre-Bid Conference and Tour December 16, 2022 Date Email Questions Due January 13, 2023 Date Email Answers Issued January 16, 2023 Sealed Bids Due/Public Bid Opening January 19, 2023 Negotiation of General Contractor Contract January 24, 2023 Contract Approval (projected) January 26, 2023 Anticipated Design Start January 31, 2023 Anticipated General Contractor Start January 31, 2023 Anticipated Construction Finish June 15, 2023 Otero College and the State of Colorado assume no responsibility for costs related to the preparation of submittals. The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on ColoradoVSS website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time. Point of Contact/Clarification: Jennifer Johnston or David Girard, Otero College Phone: 719-384-6841 or 719-384-6819 Fax: 719-384-6947 Email: Jennifer.Johnston@otero.edu or David.Girard@otero.edu
Post-Bid
Fitness / Rec Centers
$784,500.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 24, 2023
January 31, 2023
1802 Colorado Ave, La Junta, CO
Related To This Project
La Junta, CO
Bid Date: Jun 15 2022
La Junta, CO
Bid Date: May 26 2022
La Junta, CO
Bid Date: Jun 06 2022
La Junta, CO
Bid Date: Feb 03 2023
La Junta, CO
--
La Junta, CO
Bid Date: Jul 31 2023
La Junta, CO
Bid Date: Jul 27 2023
La Junta, CO
Bid Date: Sep 19 2019
La Junta, CO
Bid Date: May 18 2022
La Junta, CO
Bid Date: Dec 01 2022
La Junta, CO
Bid Date: Dec 13 2022
La Junta, CO
Bid Date: Sep 26 2022
Loveland, CO
Bid Date: Jan 05 2023
Hayden, CO
Bid Date: Jan 19 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.