BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2022 at 7:00 PM

Updated June 5, 2024

Site work and paving for a mixed-use development in Toledo, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project will resurface 750 feet of pavement at the Detroit Avenue and Dorr Street intersection and add safety improvements, and will reconstruct 280 feet of pavement on Woodland Avenue from Detroit Avenue to Junction Avenue. This includes removing and replacing the pavement, curb and gutter and the drive approaches, as well as minor drainage improvements. This project will also construct 500 feet of multi-use path. Bids for this project can only be accepted electronically. All lines shall be quoted. All bids must have the required paperwork and bid guaranty attached with this e-bid in order to be deemed responsive. If you are e-bidding and are using a check as the bid guaranty, the check must be received by the Division of Purchases and Supplies no later than the due date and time to be deemed responsive. The bid guaranty may be a bid bond or a certified check or cashier's check on a solvent bank. City forms must be filled out and attached to the bid: Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; Signed Contract by Vendor CEO/President; Certificates of Insurance; Current Worker's Compensation Certificate; Court-Ordered Child Support Affidavit; Independent Contractor PERS forms; and additional Insurance as Required. ODOT requires a DBE Utilization plan to be submitted prior to bid opening. The following items will be required prior to awarding the contract: The apparent low bidder must submit C-92s and a DBE Affirmation form to ODOT as well.Prevailing Wages are required for this project. It is the obligation of a contractor or subcontractor to make payment in accordance with the prevailing wage determinations. Current prevailing wage rates may be found on the Division of Purchases. Pre-Bid Meeting - No Bid Bond - 5.00%,Payment Bond - 0.00%,Performance Bond - 100.00% Q&A Deadline December 14, 2022 2:00 PM (EST)

Bid Results

Roads / Highways

$971,530.00

Public - City

Paving, Site Work

25

7

4

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
204
Bidding Soon
2,438
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2022

January 19, 2023

Project location map

Dorr St & N Detroit Ave, Toledo, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.