BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Wenatchee, Washington. Completed plans call for the renovation of a water / sewer project.

Supplying all labor, materials, tools, equipment, facilities, and all other appliances and supplies as specified, and performing all work required in accordance with the Contract Documents For questions, email BiddingOpportunities@ ChelanPUD.org or call (509) 661- 4479. The District reserves the right to reject any and/or all bids, to waive informalities, and to accept any bid which is in the District s best interests. The Contractor shall furnish all labor, tools, equipment, supervision and specific materials to perform the Work outlined below, as shown on the Contract Drawings, and as specified in the Contract Documents for the Rocky Reach C-10 and C-11 Babbitted Bearing Refurbishment. The Contractor shall furnish all labor, supervision, tools, equipment and materials required for the re-babbitting and machining of up to two (2) Generator Thrust Bearing shoe assemblies (8 shoes per assembly), two (2) Generator Guide Bearing pad assemblies (20 shoes per assembly), and two (2) Turbine Guide Bearings (3 segments per assembly) for the Rocky Reach Hydroelectric Project Units C-10 and C-11. Further requirements are stated in the Specifications. The assemblies and bearings are currently located at Rocky Reach Dam. The District, at its own cost, will be responsible for transporting the bearings to the Contractor's facility, loading and unloading at Rocky Reach Dam. The Contractor shall be responsible at its own cost for unloading at the Contractor's facility; duties; fees; taxes; and handling for all required materials; loading and transporting to the District's Rocky Reach Dam. The first set of babbitted bearings will be ready for shipment in approximately May 2023 and the second set of bearings will be ready for shipment in approximately January 2024. The District will perform as-found inspections of the bearings to determine if refurbishment is required for each of bearing assemblies prior to shipping to Contractor.

Award

Water / Sewer

$382,200.00

Public - County

Renovation

6

9

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
2
Bidding Soon
96
All Active Projects
28
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2022

May 15, 2023

img_map_placeholder

To Be Determined, Wenatchee, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.