BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for a mixed-use development in Roseville, Illinois. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

The estimated construction cost is $150,000 to $200,000 Proposals shall be accompanied by Bid Guarantee in form of a Bid Bond for 5 percent of the gross amount of the bid, made payable as described in the Contract Documents. such bid bond shall be forfeited as liquidated damages by the Bidder should he fail to enter into a contract and furnish a satisfactory performance bond within the following number of days: 10, after notification of acceptance of his proposal The bid bonds of all excepting the three lowest formal bidders will be returned within the following number of days after the bid opening: 7 The remaining bid bonds will be returned within the following number of days after the bid opening: 30, with the exception mentioned above. All proposals must be made on forms furnished by Morland Environmental Services. No bid may be withdrawn after scheduled closing time for the receipt of bids for at least this number of days: 30 The owner reserves the right to reject any and all bids and to waive any informalities in bidding. All work performed in this project shall comply with Illinois Statutes concerning payment of prevailing wages. All contractors and subcontractors shall comply with Illinois Statutes concerning mandatory drug testing for all workers on this project. (Signed) Board of Education. Non-Friable removal of approximately 6428 square feet of asbestos containing floor tile and mastic as well as non-ACM baseboard and baseboard mastic. Friable removal of approximately 1338 square feet of asbestos containing floor tile and mastic as well as non-ACM baseboard, baseboard mastic, carpet and carpet mastic in 1 full containment. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Educational

$179,000.00

Public - City

Asbestos Abatement, Site Work

9

12

2

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
24
Bidding Soon
436
All Active Projects
186
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.