BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Crystal Lake, Illinois. Completed plans call for the renovation of a educational facility.

For: District 155 2023 Capital Improvements. Such proposals as herein concerned shall be for the following as described: BID GROUP 2 BID PACKAGES #1 - 9 Bid Package #01 - General Trades Bid Package #02 - Roofing Bid Package #03 - Windows/Glazing Bid Package #04 - Flooring Bid Package #05 - Epoxy Floor Bid Package #06 - Painting Bid Package #07 - Plumbing Bid Package #08 - HVAC Bid Package #09 - Electrical Pre-qualification of all bidders in this bid phase is required prior to the bid due date. Submit one fully executed copy of AIA Document A305 Contractors Qualification Statement prior to submitting this bid form email to Thomas Grunert at tgrunert@pepperconstruction.com. The competency and responsibility of the bidders will be considered in making awards. The successful bidder shall, upon acceptance of his bid, be required to procure and pay for a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid. Bonds shall comply with all laws of the State of Illinois governing public contracts let by governmental units. Bid security in the form of a Bid Bond, certified check or cashier's check made payable to Community High School District 155 in an amount equal to not less than ten percent (10%) of the Base Bid shall be submitted with the Bid. Bid security is required of all parties submitting a proposal. A fully executed and compliant Bid Security must be included with the Bid Form. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). The Construction Manager for this project is Pepper Construction Company. All questions concerning this project or those concerning bidding requirements should be directed to: Thomas Grunert. Questions must be received email to tgrunert@pepperconstruction.com until 3:00 PM (CST) Friday, December 9, 2022. The School District reserves the right to reject any or all bids, to negotiate contract terms with various Bidders, and to waive all formalities or irregularities to any bid when such is deemed by the Owner to be in the Owner's best interests.

Post-Bid

Educational

$3,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
128
Bidding Soon
2,157
All Active Projects
935
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2022

January 13, 2023

img_map_placeholder

Multiple Locations, Crystal Lake, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.