Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a transportation facility in Toronto, Ontario. Completed plans call for site work for a transportation facility.
February 20, 2024 Infrastructure Ontario and Metrolinx have selected Trillium Guideway Partners (TGP) to deliver the Ontario Line Elevated Guideway and Stations contract. The team has signed a Development and Master Construction Agreement (DMCA) with Metrolinx, under a progressive design-build contract. The Trillium Guideway Partners team includes: - Applicant Leads: Acciona Infrastructure Canada Inc. and Amico Major Projects Inc. - Design Team: WSP Canada Inc. - Construction Team: Acciona Infrastructure Canada Inc. and Amico Major Projects Inc. The team was selected following an evaluation of proposals submitted in September 2023. The selection of TGP is the result of an open, fair and competitive procurement process overseen by a third-party fairness monitor. The DMCA incorporates a multi-stage design process called a development phase, according to the progressive design-build model. This phase allows for a collaborative approach between Metrolinx as the project owner and TGP as the contracting partner, who work together to finalize the scope, risk allocation and pricing of various elements of this contract. The development phase is anticipated to take up to 20 months, though early works construction can commence during this phase. Once the development phase has concluded, Metrolinx will have the option to sign a final target-price agreement with TGP, which would include final agreements on detailed designs and a negotiated price. The scope of work includes three kilometres of an elevated guideway (bridge structures); five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemingdon Park, Science Centre), one emergency exit building, interface with the operations and maintenance storage facility as well as with the Eglinton Crosstown LRT Line 5 and sections of existing Metrolinx-owned rail corridor where Ontario Line trains will operate. The Ontario Line project is being delivered through various public-private partnership (P3), progressive design-build and traditional procurement contracts, which are all being staged accordingly for their successful delivery. Infrastructure Ontario (IO) and Metrolinx have issued Requests for Proposals (RFP) for two major works packages for the Ontario Line: Pape Tunnel and Underground Stations and the Elevated Guideway and Stations contracts. Six teams have been shortlisted and invited to bid on the packages, which are being delivered using a Progressive Design-Build delivery model. Shortlisted teams were selected based on criteria identified in the Request for Qualifications process that began in November 2022, which included their design and construction experience. The following teams and their prime team members were invited to respond to the RFPs: Pape Tunnel and Underground Stations STRABAG Inc. - Applicant Lead: STRABAG Inc. - Design Team: Arup Canada Inc. - Construction Team: STRABAG Inc. Pape North Connect - Applicant Leads: Webuild S.p.A., FCC CONSTRUCCIÓN, S.A. - Design Team: IBI Group Professional Services (Canada) Inc., AECOM Canada Ltd. - Construction Team: Webuild S.p.A., FCC CONSTRUCCIÓN, S.A. Trillium Subway Partners - Applicant Leads: Acciona Infrastructure Canada Inc., Eiffage Innovative Canada Inc., Amico Infrastructures Incorporated - Design Team: WSP Canada Inc. (Lead Designer), Typsa Canada Inc., LEA Consulting Ltd. - Construction Team: Acciona Infrastructure Canada Inc., Eiffage Innovative Canada Inc. Elevated Guideway and Stations: Rail Connect Partnership - Applicant Leads: SNC-Lavalin Major Projects Inc., Bird Construction Industrial Services Ltd. - Design Team: T.Y. Lin International Canada Inc., Entuitive Corporation - Construction Team: SNC-Lavalin Major Projects Inc., Bird Construction Industrial Services Ltd. Transit Expansion North - Applicant Leads: Pomerleau Inc., Aecon Infrastructure Management Inc., Bouygues Travaux Publics S.A.S. - Design Team: Parsons Inc., SYSTRA International Bridge Technologies Canada, Inc., GHD Limited - Construction Team: Aecon Infrastructure Management Inc., Bouygues Travaux Publics S.A.S. Trillium Guideway Partners - Applicant Leads: Acciona Infrastructure Canada Inc., Amico Infrastructures Inc., Dufferin Construction Company, a division of CRH Canada Group Inc. - Design Team: WSP Canada Inc. - Construction Team: Acciona Infrastructure Canada Inc., Amico Infrastructures Inc., Dufferin Construction Company, a division of CRH Canada Group Inc. Teams will begin preparing proposals that detail how they will deliver these projects. Proposals will be evaluated by IO and Metrolinx and the top-ranked team for each project will work collaboratively with Metrolinx during a Development Phase, expected to start in 2024. Once the Development Phase is completed, Metrolinx will have the option to sign a contract with the successful team. The Ontario Line will be a 15.6-kilometre new rapid transit line in Toronto running between the Ontario Science Centre and Exhibition/Ontario Place, with 15 stations along the way. The new line will provide more than 40 connections to other subway, bus, streetcar, light-rail transit and regional rail services. The Ontario Line project is being delivered through various Public-Private-Partnership (P3), progressive design-build and traditional procurement contracts, which are all being staged accordingly for their successful delivery. This segment of the project is being delivered through four packages of work: two major works contracts as noted above and two smaller early works contracts via www.metrolinx.com/tenders.
Award
Transportation Terminals
$50,000,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
September 29, 2023
March 1, 2024
February 28, 2026
Multiple Locations, Toronto, ON
Related To This Project
Toronto, ON
--
Toronto, ON
Bid Date: Sep 26 2019
Toronto, ON
--
Toronto, ON
Bid Date: Jan 27 2023
Toronto, ON
--
Toronto, ON
Bid Date: Jan 17 2023
Toronto, ON
Bid Date: Jan 30 2023
Toronto, ON
--
Toronto, ON
Bid Date: Jan 31 2023
Toronto, ON
Bid Date: Feb 03 2023
Toronto, ON
--
Toronto, ON
--
Toronto, ON
Bid Date: Jan 20 2023
Toronto, ON
Bid Date: Jan 19 2023
Toronto, ON
Bid Date: Jan 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--