BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2023 at 7:00 PM

Updated February 13, 2024

Site work, paving and outdoor lighting for a mixed-use development in Brookville, Indiana. Completed plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Project Description: Franklin County Government Center Accessible Entrance Improvements This project includes construction of a new accessible parking area and other accessibility improvements. Work includes demolition, ear thwork, concrete sidewalks and curbs, retaining wall, drainage, lighting, and landscaping. Location- 1010 Franklin Ave Brookville, IN 47012 No bid bond will be required. The bidder awarded the contract will be required to furnish a separate Performance Bond and Payment Bond, each in the amount of one-hundred twentyfive percent (125%) of the contract price before commencing work. The Performance Bond and Payment Bond shall remain in effect throughout the entire construction period and in addition a Warranty Bond in an amount of 10% for a period of three years from the date of final completion will be required. Each bidder shall be required to complete all documents listed in the Checklist for Bidders Each bidder shall be required to complete the Bid Form included with these documents Franklin County, Indiana, reserves the right to reject any and all bids and to waive any irregularities in bidding and to make an award in the best interest of the County No bid or bid security may be withdrawn after the scheduled closing time for receipt of bids for at least sixty ( 6 0 ) days . Work includes the construction of elements associated with developing a new accessible entrance and accessible parking area. Associated site improvements include but are not limited to the following: a. Removals. b. Pavements/walks. c. Earthwork, Excavation, and Grading. d. Block retaining wall. e. Electrical/site lighting improvements. f. Landscaping. g. Other associated work as indicated in the Contract Documents including the Drawings and Project Manual. Start Construction - February 1, 2023 Substantial Completion - June 30, 2023 Final Completion - July 31, 2023

Award

Sidewalks / Parking Lot

$359,000.00

Public - County

Outdoor Lighting, Paving, Site Work

16

16

2

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
122
Bidding Soon
2,245
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2022

February 1, 2023

Project location map

1010 Franklin Ave, Brookville, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.