BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Gauley Bridge, West Virginia. Conceptual plans call for site work for a water / sewer project.

The Kanawha Falls Public Service District, located in Fayette County, West Virginia is in the process of obtaining the services of a consulting engineer to provide assistance with the restoration and rehabilitation of public water and wastewater infrastructure damaged as a result of the August 15, 2022 flooding that occurred within PSDs service area The consultant will be required to (1) prepare preliminary engineering report(s), (2) design and prepare construction drawings, bid specifications and bid documents, (3) evaluate bids received and make recommendation of award, (4) monitor and inspect construction activities to insure compliance with plans and specifications, (5) review and approve contractors pay estimates and (6) any other services needed by the Commission and Town for the implementation of this project. All consultants interested in being considered for this project must submit a proposal detailing qualifications, technical expertise, management and staffing capabilities and related prior experience. The purpose of the competitive process is to objectively select the consultant who will provide the highest quality of service at a realistic fee. Accordingly, technical qualifications and experience will be weighed heavily. For questions or additional information, please contact the Kanawha Falls PSD at (304)632-1633. It is the responsibility of the respondent to ensure the receipt of the proposal by the date specified. Attention is directed to the fact that the project may be undertaken with a combination of State and ederal funds and all work must be performed in accordance with all applicable laws, rules and regulations. The selected firm will be required to comply with the Uniform Relocation Act, Title VI of the Civil Rights Acts of 1964, Presidents Executive Order No. 11246, Section 109 of the Housing and Urban Development Act of 1974, Section 3 of the House and Urban Development Act of 1968, Conflict of Interest Statement and Access to Records provisions. The selected firm must also fully comply with the Minority omen-Owned Business Enterprise and Affirmative Action requirements. If a portion of the contract is subcontracted, thenpositive efforts must be made to subcontract to Minority omen-Owned Businesses. This shall be done in compliance with the six (6) affirmative steps as outlined in 40 CFR 33.240. The project sponsor will afford full opportunity to women-owned and minority business enterprises that submit a show of interest in response to this request and will not discriminate against any interested firm or individual on the grounds of race, creed, color, sex, age, handicap or national origin in the award of this contract. This contract will be awarded to the responsible offeror whose proposal is within the competitive range and determined to be the most advantageous to the Project Sponsor, price and other factors considered. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

$2,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
55
Bidding Soon
716
All Active Projects
404
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 28, 2023

img_map_placeholder

Multiple Locations, Gauley Bridge, WV


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.