EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 16, 2023 at 8:00 PM

Updated January 26, 2024

Site work, paving and outdoor lighting for a mixed-use development in East Grand Rapids, Michigan. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; and water / sewer project.

**As of March 16, 2023, the contract was awarded to Katerberg VerHage for $3,221,155.11 and it will have various start dates since there are 3 sites involves, the first of which will begin mid April, the 2nd in mid may, and the 3rd in early June. Project is estimated at $2.6 Million. The scope of this project includes improvements at the following school locations: Breton Downs Elementary 2500 Boston St SE, Grand Rapids, MI 49506 Lakeside Elementary 2325 Hall St SE, Grand Rapids, MI 49506 Wealthy Elementary 1961 Lake Dr SE, East Grand Rapids, MI 49506 Specific items include installation of playground equipment; supply and install of playground surfacing, parking area, shelter structures; ballfield including stone dust, backstop, fencing and turf seeding; fencing including ball control netting, basketball courts, other court resurfacing, bituminous pavement, concrete pavement, seat and retaining walls, storm and crossfield drainage, fencing and gates, site lighting and electrical work, landscaping and lawn seeding. Proposals must be accompanied by a certified check, bank draft of bid bond of an approved surety company doing business in Michigan in an amount equal to five percent (5%) of the total amount proposed. Proposals shall be submitted in accordance with the Information for Bidders of the bid documents. The Owner reserves the right to reject any or all bids or any parts of the same, waive any irregularities, and to accept any bid in their own best interest. Begin Construction June 3, 2023 Construction Complete August 11, 2023 Bid Results :: Breton Downs :: Katerberg VerHage $853,391.00 Lakeside :: Katerberg VerHage $1,489,988.00 Wealthy :: Katerberg VerHage $777,847.86

Award

Playgrounds / Parks / Athletic Fields

$3,221,155.00

Public - City

Outdoor Lighting, Paving, Site Work

51

13

11

5

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs, Residential Furniture, Beds, Multiple Seating, Pews and Benches, Benches
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Athletic and Recreational Surfacing, Tennis Court Surfacing, Planting, Planting Preparation, Turf and Grasses, Sodding, Plants, Trees, Planting Accessories, Tree Grates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
48
Bidding Soon
654
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2023

March 7, 2023

img_map_placeholder

Multiple Locations, East Grand Rapids, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.