BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 29, 2022 at 7:00 PM

Updated January 26, 2024

Site work and new construction of a playground / park / athletic field in Maumee, Ohio. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Audu-Bon Islands State Nature Preserve Restoration Design-Build ECT Proposals received after the specified due date and time will not be considered. In General, THE SCOPE OF SERVICES consists of design, oversight and imple- mentation of island restoration at multi- ple locations within an island complex owned by Metroparks. Three (3) copies of the Proposal must be sealed and marked as above. The Metropolitan Park District of the Toledo- Area will directly select a firm based on the Proposal. The selected Contractor will be required to complete the following tasks for the Project: 1. Provide plans and create/utilize concept designs for stabilizing eroding island banks, and increasing habitat heterogeneity along island shorelines and within Ewing Island's cove. If the proposed design creates a need for any specialized engineering or geotechnical services, the Contractor's proposal should address each service. a. For stabilizing eroding island banks whilst abstaining from breaking earth on Tribal lands, design documents shall include specific locations and specifications on shoreline restoration techniques to be implemented. b. For all native woody vegetation proposed for use in this restoration project, design documents shall include a detailed listing for all tree and shrub species by type (e.g., live stake, bare root, containerized), size, and quantity. 2. Coordinate plans for the Project with the Ohio EPA Division of Surface Water and Metroparks. 3. Conduct weekly communications on project progress via phone or email with designated Metroparks staff. 4. Complete a Storm Water Pollution Prevention Plan ("SWPPP") for the proposed design. Erosion and sediment must be controlled throughout the construction process in accordance with the Ohio EPA construction general permit. 5. Coconut coir erosion control matting (or similar product preapproved by Metroparks) must be utilized for all erosion control measures. Use of any nylon or polyester materials for erosion control is strictly prohibited 6. Project Construction: The selected contractor shall perform construction of this Project per the design as approved by Metroparks and per the terms and conditions of the Contract. Questions regarding this RFP must be emailed with "Audubon Islands" in the subject line to the following Metroparks contact person no later than December 23, 2022: Zurijanne Carter, Deputy Chief of Natural Resources zuri.carter@metroparkstoledo.com

Post-Bid

Playgrounds / Parks / Athletic Fields

$3,570,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
129
Bidding Soon
2,232
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2023

May 8, 2023

Project location map

To Be Determined, Maumee, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.