Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 27, 2022 at 7:00 PM
Updated January 26, 2024
Site work and paving for a civil project in Fresno, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Scope of Services Services will include preparation of necessary plans, specifications, estimates, necessary utility relocations and utility coordination and environmental document preparation. In general: o Participate in coordination meetings with City Staff o Community Engagement and participation in Community Meetings o Conduct site investigation in order to prepare construction documents o Provide Geotechnical testing as required o Prepare and maintain design and construction schedule o Prepare all required CEQA documentation. The City will provide formal notification, pursuant to AB 52, to designated contact or tribal representative of traditionally and culturally affiliated California Native American tribes for tribal consultation, prepare a Notice of Intent to adopt, perform all required CEQA postings and noticing and prepare the notice of Determination. o Prepare construction plans, technical specifications, and construction cost estimates at each phase of work identified in the consultant agreement o Submitting construction documents for review to City offices, utilities/agencies, and obtaining final signatures on construction documents o As part of the construction phase and general construction contract administration, attend the pre-construction conference, review shop drawings and other contractor submittals, provide clarification of construction documents during construction, review and provide technical information for construction contract change order request if necessary, and perform as many as two site visits during construction. Should you have any questions or require additional information, please contact Armando Cervantes in writing by email at Armando.cervantes@fresno.gov. Phone calls will NOT be accepted. Special Notices The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
$648,400.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2023
N Milburn Ave, Fresno, CA
Related To This Project
Fresno, CA
Bid Date: Dec 20 2022
Fresno, CA
Bid Date: Jan 10 2023
Fresno, CA
--
Fresno, CA
Bid Date: Jan 17 2023
Fresno, CA
--
Fresno, CA
Bid Date: Dec 16 2022
Fresno, CA
Bid Date: Dec 08 2022
Fresno, CA
Bid Date: Mar 11 2022
Fresno, CA
Bid Date: Jan 05 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
