BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 19, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Fresno, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The scope of work includes, but is not limited to; the conversion of an existing Class II bike lane to a Class IV bikeway or creation of a Class IV bikeway along Barstow Avenue, from Blackstone to Cedar, overlay from Blackstone to Fresno, roadway slurry seal, traffic signal loop detection, video detection and signage. Question Deadline 01/03/2023 at 5:00 PM PT Online Q&A Yes The Construction Allocation for this project is $1,904,020.

Bid Results

Roads / Highways

$2,184,580.00

Public - City

Paving, Site Work

20

5

19

8

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
54
Bidding Soon
676
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2023

March 20, 2023

Project location map

E Barstow Ave, Fresno, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.