BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Huntsville, Alabama. Completed plans call for the renovation of a 7,000-square-foot educational facility.

A cashier's check or bid bond (DCM Form C-4) payable to The University of Alabama in Huntsville in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. Subcontractors and suppliers may obtain Bid Documents thru a bidding contractors or Datatek. Only general contractors who have been approved to bid pursuant to prequalification procedures and criteria established by the Owner will be eligible to bid for the Project. Written prequalification procedures and criteria are available for review at the office of Fuqua & Partners Architects, P.C., 100 Church Street, Suite 700, Huntsville, AL 35801. Bids must be submitted on proposal forms furnished by the Architect (Engineer) or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect (Engineer); the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted. Notice of Sales & Use Tax Exemption: Materials incorporated into the Work are exempt from sales and use tax pursuant to Alabama Act No. 2013-205 (effective October 01, 2013). The contractor and their subcontractors shall be responsible for complying with rules and regulations of the Sales, Use, and Business Tax Division of the Alabama Department of Revenue regarding certificates and other qualifications to claim such exemption when making qualifying purchases from vendors. The Owner shall not consider claims for additional costs resultant of the contractor's, or their subcontractor's, failure to comply with such rules and regulations. Alabama Law (Section 41-4-116, Code of Alabama 1975) provides that every bid submitted and contract executed shall contain a certification that the vendor, contractor, and all of its affiliates that make sales for delivery into Alabama or leases for use in Alabama are registered, collecting, and remitting Alabama state and local sales, use, and/or lease tax on all taxable sales and leases into Alabama. Alabama Immigration Law (Act 2011-535 and codified in state law as Title 31, Chapter 13 of the Code of Alabama 1975, amended by Act No. 2012-491) requires the University to require all Contractors to enroll in the E-Verify program and to provide documentation of enrollment in the E-Verify program with their contracts or agreements. This is applicable to all General Contractors and Subcontractors performing work on a University project. Nonresident bidders must accompany any written bid documents with a written opinion of an attorney at law licensed to practice law in such nonresident bidder's state of domicile, as to the preferences, if any or none, granted by the law of that state to its own business entities whose principal places of business are in that state in the letting of any or all public contracts. Contractors may obtain PDF formatted Bid Documents from the Architect upon providing contact information. This contact information (email) is required and will be used for electronic distribution of any addenda or other information. Addenda and other information will be issued only to holders of drawings and specifications distributed by the Architect. he Work of Project is defined by the Contract Documents and consists of the following: 1. As described in the Bid Documents, project consists of the roof replacement of the Central Plant Building. The Central Plant Building is a single story building with approximately 7,000 square feet of roof, which includes one (1) roof area (drainage area) on one (1) level. Roof drainage is provided by four (4) internal roof drains with no emergency overflow drains and two (2) through-wall scuppers. Project will include a recover roofing with an adhered membrane roofing system and the removal and replacement of wet roofing with new roofing as indicated in the drawings.

Post-Bid

Educational

$70,000.00

Public - State/Provincial

Renovation

8

14

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
10
Bidding Soon
411
All Active Projects
158
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2023

February 13, 2023

img_map_placeholder

520 Charger Way, Huntsville, AL


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.