EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 4, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Peoria, Illinois. Completed plans call for the renovation of a educational facility.

Charter Oak HVAC Upgrades To demonstrate qualification for performing the Work of this Contract, bidders may be requested to submit written evidence of financial position, license to perform work in the State. Bidder's signature shall be construed as acceptance of, and willingness to comply with, all provisions of the Illinois Revised Statutes, Chapter 48, 39S-1, 39S-12, and Prevailing Wages Law, as amended August 8, 1961. All laborers, workers and mechanics engaged in construction will be paid not less than the "Prevailing Wage". Contractor agrees to abide by the current Prevailing Rate of Wages for Construction Workers for Peoria County. In other words, bidders are required to increase wages as necessary during the term of this contract as to keep current with the prevailing wage rates. No changes will be allowed in the amount of this contract as additional compensation for such changes. It shall be mandatory that the Contractor will not discriminate against any employee or applicant for employment upon any ground prohibited by the Human Rights Act (775 ILCS 5/1-101) and further that the contractor will comply with all provisions of the Human Rights Act including, but not limited to, rules and regulations of the Illinois Human Rights Commission. The Contractor will not discriminate against any employee or applicant for employment because of age, race, creed, color, sex, national origin or disability. The Contractor will take affirmative action to ensure the applicants are employed, and that employees are treated equally during employment, without regard to their age, race, creed, color, sex, national origin or disability. Such action shall include but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to age, race, creed, color, sex or national origin. The Contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations and orders of the Secretary of Labor, or pursuant thereto and will permit access to his/her books, records and accounts by the contracting agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations and orders. In the event of the Contractor's noncompliance with the nondiscrimination clauses of this Contract or with any of such rules, regulations or orders, this Contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or Federally assisted construction contracts, in accordance with the procedures authorized in Executive Order of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order No. 11246 of September 24, 1965, or by rules, regulation or order of the Secretary of Labor, or as otherwise provided by Law. Bid Bond of a sum no less than 5 percent of the Bid Amount on AIA A310 Bid Bond Form. The security deposit will be returned after delivery to the Owner of the required Performance and Payment Bond(s) by the accepted bidder. If an M/WBE subcontracts a portion of its work to an M/WBE, 100% of the value of the subcontracted work may be counted toward the M/WBE goal, but any portion of the work the M/WBE subcontracts to a non-M/WBE does not count toward the M/WBE goal. Owner reserves the right to reject a proposed subcontractor for reasonable cause The Project Consists of Removal and Installation of Acoustical Ceiling Tile, Lighting and Revision to the Hvac System. The Scope of Alterations Work as Indicated on Drawings: Alternate No. 1 - Remove Selected Existing 2x4 Ceiling, Grid, Light, Supply Air and Return. Locations: First Floor - Two (2) Corridors and Two (2) Classrooms. Second Floor - One (1) Corridor and Four (4) Classrooms Alternate No. 2 - Removed Selected Exisiting 2x4 Ceiling, Grid, Light, Supply Air And Return. Install New 2x2 Ceiling, Grid, 2x2 Light, Supply Air and Return. Locations: Multipurpose Room

Post-Bid

Educational

$200,000.00

Public - City

Renovation

42

16

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Stairs
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Joint Protection, Preformed Joint Seals, Backer Rods, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Access Doors and Panels, Windows, Hardware, Window Hardware, Window Operators, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Acoustical Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Distributed Communications and Monitoring Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
62
Bidding Soon
721
All Active Projects
403
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2023

February 3, 2023

img_map_placeholder

5221 W Timberedge Dr, Peoria, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Charter Oak HVAC Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.