Site work for a water / sewer project in Baltimore, Maryland. Completed plans call for site work for a water / sewer project.

Question Deadline 01/17/2023 at 3:00 PM ET All questions should be received to jjay1@mdot.state.md.us. All questions will be answered via an addendum on eMMA. The work associated with the Agency Wide Waterfront Structure Repairs includes pre-construction inspections for base-mapping of concrete slab and deck defects, selective demolition and removal of concrete deck and slab surfaces, constructing concrete spall repairs, repairing damaged slab reinforcing by way of welded splices, performing a bonded overlay slab mock-up and tensile pull test program, providing bonded overlay repairs at areas of wide-spread and interconnected deck surface defects, repairing concrete cracks by pressure-injected epoxy method, repair of reinforced steel armor edging and expansion joints, repair of under-slab voids within cargo sheds by way of polyurethane injection, and construction of flexible/high-strength epoxy ramps at shed door openings to accommodate elevation differences due to slab settlement. The work will require minor selective demolition for preparation of transition ramp areas, and disposal of any excess underpin material and associated construction waste and all related Work at all marine terminals and Administration facilities. In addition, the work includes concrete crane beam encasement repairs; concrete pile encasement repairs; construction of integral cathodic protection system for concrete piles; steel sheet pile bulkhead repairs, timber pile repairs; timber cap repairs; installation of sacrificial cathodic protection systems; steel H-pile encasement repairs; collection of timber pile samples for laboratory testing; collection of concrete core samples for laboratory testing; upgrades to existing recessed bollard installations; steel pipe pile installation; fender replacement and repairs; ladder replacement and repairs; riprap shoreline stabilization repairs; and all related work at all marine terminals and Administration facilities. Project Duration: 1,095 Calendar Days (3 Years) MBE Subcontracting Goal: 16% VSBE Subcontracting Goal: 0%

Post-Bid

Water / Sewer

$15,000,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

20

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
101
Bidding Soon
2,460
All Active Projects
960
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2023

July 1, 2023

img_map_placeholder

Multiple Locations, Baltimore, MD

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.