BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Santa Cruz, California. Completed plans call for the renovation of a educational facility.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. The work described in the contract is a public work subject to section 1771 of the California Labor Code.No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour as of 10/1/17) and shall comply with all applicable federal, state and local working condition requirements. Wharf Fire Hydrant Replacement Project - Description of Work: This project includes replacement of 33 wharf hydrants in various parts of campus: - Replace 31 wharf hydrants with conventional 6" wet barrel fire hydrants - Remove 2 wharf hydrants and replace with 4" riser, valve and cap NOTE: Construction is to be performed 04/15/2023 to 09/01/2023. Estimated construction cost: $733,000 Requests for clarification or interpretation of the Bidding Documents shall be received no later than 5:00 PM on Tuesday, January 17, 2023 and addressed only to: Nathan Weiner University of California, Santa Cruz Physical Planning, Development & Operations 1156 High Street Santa Cruz, CA 95064 naweiner@ucsc.edu

Bid Results

Educational

$647,500.00

Public - State/Provincial

Renovation

27

20

6

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
119
Bidding Soon
2,283
All Active Projects
967
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 14, 2023

May 3, 2023

September 20, 2023

img_map_placeholder

Multiple Locations, Santa Cruz, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.