BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated March 12, 2025

Renovation of an educational facility in Saint-Bruno-de-Guigues, Quebec. Completed plans call for the renovation of a educational facility.

Reference number : 1786583 Deadline for receiving complaints: 2024-01-15 Electronically submitted submission accepted: Yes, in a single submission document Expected duration of the contract without options (in months): 10 Summary of work covered by the contractual documents The purpose of this mandate is to carry out construction work on the expansion for the new elevator at the Marie-Assomption school in St-Bruno-de-Guigues, as well as the related redevelopment work. In addition to all the work normally required for the complete completion of the work mentioned above, that is to say demolition, interior fittings and finishes, mechanical systems, electrical systems, control systems, etc., the work to be carried out within the framework of this mandate specifically shown in the drawings and described in the specifications includes, among other things and without limitation, the supply and installation of materials, equipment and accessories required for: b) Installation of the new elevator; c) Asbestos removal/work in the presence of asbestos; d) Addition/Replacement of floor covering in the premises indicated; e) Addition/Replacement of suspended ceilings in the premises indicated; f) Painting of the premises indicated; g) Addition/Replacement of doors where indicated; h) Dismantling of windows and installation in the indicated locations; i) Structural/mechanical/electrical works according to the engineering plans provided; j) Relocation of equipment following the work according to the client's needs DEADLINE Unless otherwise agreed by the PARTIES in accordance with the Contract, the Works shall be carried out according to the proposed Schedule. Start of exterior work: April 1, 2024 Interior work can begin at the beginning of April in certain premises on an evening schedule starting at 6:00 p.m. From June 25, 2024, the work schedule will be able to return to daytime until the end of the work. The new elevator must be in service and accessible to students with reduced mobility for two weeks before the CSS gives authorization to dismantle the existing platform for disabled people. Work in occupation mode must be coordinated with the CSS in order to delimit the site and ensure the safety of the students.

Award

Educational

$2,487,867.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
0
Bidding Soon
91
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

April 1, 2024

Project location map

23 Rue Principale N, Saint-Bruno-de-Guigues, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.