EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 21, 2023 at 7:00 PM

Updated October 1, 2024

Site work, paving and new construction of a mixed-use development in Santa Clara, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the construction of a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of February 21, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The engineer's estimate is between $4 million and $5.7 million. Bidders may obtain further information from: Project Engineer: HUY NGUYEN Email: HNGUYEN1@SANTACLARACA.GOV Telephone: 1+(408) 615-3073 Fax: 1+(408) 985-7936 Mailing address: City of Santa Clara 1500 Warburton Avenue Santa Clara, CA 95050 The Work consists of, but is not limited to: clear and grub and demolition and removal of existing hardscape paving, fencing, play equipment, site furnishings, electrical and light poles, drainage, relocation of existing stone blocks and softscape; earthwork, material export, erosion control, construction fencing and staging, tree removal and protection and utility work, electrical upgrades, technology upgrades, construction of playground elements and playhouse, paving, fencing, signage, walls, site furnishings, irrigation, and planting. The Work also includes mobilization/demobilization, traffic control, permitting and agency coordination, and other incidentals necessary to complete the playground Project. The Work shall reach Substantial Completion within four hundred fifty (450) Calendar Days from the date when the Contract Time commences to run. The Work shall reach Final Completion within four hundred eighty (480) Calendar Days from the date when the Contract Time commences to run. See Document 00050, References and Definitions, for definitions of Substantial Completion and Final Completion. Refer to Document 00520 for interim completion requirements for sub-phases of work. A California "A" contractor's license is required to bid this contract. Joint ventures must secure a joint venture license prior to award of this Contract. There is no pre-bid conference for this project. City specifically reserves the right, in its sole discretion, to reject any or all Bids, or re-bid, or to waive inconsequential deviations from Bid requirements not involving time, price, or quality of the Work. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Q & A deadline: Jan 12, 2023 6:00:00 PM EST

Bid Results

Playgrounds / Parks / Athletic Fields

$5,737,315.00

Public - City

New Construction, Paving, Site Work

72

22

14

6

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Finishing
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Other Furnishings, Site Furnishings
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Storm Drainage, Facility Storm Drainage Piping, Plumbing Fixtures
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Rough Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Planting Preparation, Soil Preparation, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
102
Bidding Soon
1,643
All Active Projects
731
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2023

March 20, 2023

img_map_placeholder

909 Kiely Blvd, Santa Clara, CA


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Central Park Magical Bridge All-Inclusive Playground Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.