BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Worcester, Massachusetts. Completed plans call for the renovation of a municipal facility.

The replacement of boiler tubes in existing Cleaver Brooks Boilers (Boilers #1 and #4) located at the Worcester Trial Court, due to age and condition. Worcester Trial Court located at 225 Main Street in Worcester. General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work Heating, Ventilation and Air-Conditioning (HVAC). 5% Bind Bond Required Project Description and Scope: The scope includes, without limiting the generality thereof, furnishing all labor, materials, tools and equipment required to re-tube Boilers #1 and #4, as specified. Remove & replace existing tubes with OEM tubes, as specified. Pressure test and make ready unit for seasonal operation. All workers must pass a Trial Court CORI check. The Contractor may use facility water and electricity. Contractor is responsible for obtaining and submitting all required permits and insurance Site visits can be arranged by reaching out to any of the following contacts: Fred Ericsson 508-635-7402 fredrik.ericsson@jud.state.ma.us Tom Falcone 508-713-3577 tom.falcone@jud.state.ma.us Michael Norman (Manager of Facilities) 508-954-1533 michael.norman@jud.state.ma.us

Post-Bid

Municipal

$275,000.00

Public - State/Provincial

Renovation

4

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
261
Bidding Soon
3,345
All Active Projects
1,484
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2023

October 30, 2023

img_map_placeholder

225 Main St, Worcester, MA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.