BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Greenville, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City of Greenville will receive sealed bids to construct a new parking lot and reconstruct the Fred Meijer Flat River Trail. The major items of the Project will consist of approximately 775 Syd of HMA surface removal; 1.3 acres of earth balancing, with a projected 885 cyd of material to be trucked to another site in Greenville; 6088 tons of aggregate base; 1069 ft of curb and gutter; 1289 sft of sidewalk; 514 tons of HMA; 3186 syd of restoration and the creation of unique landscaping features. The CITY OF GREENVILLE reserves the right to accept to reject any or all BIDS for sound, documentable business reasons. The competency and responsibility of BIDDERS will be considered in awarding CONTRACTS. NOTICE TO PROCEED: The CITY OF GREENVILLE expects to issue a NOTICE TO PROCEED by May 1, 2024 with prompt receipt of the fully executed CONTRACT and required BONDS and INSURANCE certificate. The CONTRACTOR shall begin Work within 10 days of the NOTICE TO PROCEED. Liquidated Damages: The Contractor Shall Complete the Work by the Date Given in the Contract Documents, or Extend the Date Through a Written Extension of Time for Reasonable Cause. If the Work Has Not Reached Substantial Completion, Defined as Completion of All Pay Items, by the Contract Date, the Contractor Shall Pay the Owner Liquidated Damages in the Amount of $900 Per Calendar Day to Compensate the Owner for Lost Opportunity of the Use of the Project No BIDDER shall withdraw his BID for a period of ninety (90) days after the date of the BID opening without forfeiture of his BID BOND All questions from BIDDERS, regarding any part of the Plans or Project Manual, shall be directed in writing to: Doug Hinken, P.E., City Engineer City of Greenville 411 S. Lafayette Street Greenville, MI 48838 Or by email at: dhinken@greenvillemi.org

Award

Sidewalks / Parking Lot

$379,875.00

Public - Federal

Paving, Site Work

37

11

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
51
Bidding Soon
706
All Active Projects
302
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

May 1, 2024

img_map_placeholder

To Be Determined, Greenville, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.