BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Nederland, Texas. Completed plans call for site work for a playground / park / athletic field.

Project Name: Doornbos Pond Repairs Project Number: TABS2023024164 Facility Name: Doornbos Heritage Park Pond Location Address: 2301 Avenue H Nederland, TX 77627 Location County: Jefferson Start Date: 9/12/2023 Completion Date: 1/30/2024 Estimated Cost: $1,000,000 Type of Work: Renovation/Alteration Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: The retaining wall at the pond will be replaced and the island in the middle of the pond will be removed. Square Footage: 71,000 ft 2 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 1.1 DESCRIPTION: This item shall consist of the mobilization of personnel, equipment and supplies at the project site in preparation for beginning work on other contract items. 1.2 Mobilization shall include, but is not limited to, the movement of equipment, personnel, material, supplies, etc. to the project site and the establishment of office and other facilities necessary prior to beginning the work. 1.3 MEASUREMENT: Measurement of the Item, "Mobilization" as specified herein will be by the "Lump Sum", as the work progresses. 1.4 PAYMENT: Partial payments of the "Lump Sum" bid for mobilization will be as follows. The adjusted contract amount for construction items as used below is defined as the total contract amount less the lump sum bid for Mobilization. A. When 1% of the adjusted contract amount for construction items is earned, 50% of the mobilization lump sum bid or 5% of the total contract amount, whichever is less, will be paid. B. When 5% of the adjusted contract amount for construction items is earned, 75% of the mobilization lump sum bid or 10% of the total contract amount, whichever is less, will be paid. Previous payment under this item will be deducted from the above amount. C. When 10% of the adjusted contract amount for construction items is earned, 90% of the mobilization lump sum bid or 15% of the total contract amount, whichever is less, will be paid. Previous payments under this item will be deducted from the above amount. D. Upon completion of all work under this contract, payment for the remainder of the lump sum bid for "Mobilization" will be made. E. Partial payments for mobilization will be subject to the same 10% retention as all other items of work.

Post-Bid

Water / Sewer

$1,212,567.00

Public - City

Site Work

10

16

2

4

Subscribe For Documents

108 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
13
Bidding Soon
574
All Active Projects
274
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2023

August 14, 2023

img_map_placeholder

2301 Avenue H, Nederland, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.