Site work and new construction of a mixed-use development in Saint Louis, Missouri. Completed plans call for the construction of a data center facility; and for site work for a data center facility.

THE CUT-OFF DATE AND TIME FOR RECEIPT OF S IS March 19, 2025 at 1:00 PM (ET). The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion of the EHRM Infrastructure Upgrades Data Center construction project, in accordance with the attached Specifications and Drawings. The St. Louis (Jefferson Barracks) VAMC is seeking a general contractor to furnish all labor, tools, materials, equipment, and supervision to construct a new EHRM Data Center in the Basement of Bldg. 56. The current data center in Bldg. 1 will be relocated to Bldg. 56. The scope of this project includes but not limited to the following infrastructure improvements: Electrical (power (normal, emergency), lighting), Bonding, UPS, Building Management System interfaces, assess for new HVAC, new space construction (walls, doors, finishes), fire suppression system, communication infrastructure (new Data outlets, patch panels, Cat 6A cable), physical security, fiber infrastructure backbone connectivity to MDA. VAAR Magnitude of Construction: $5,000,000 to $10,000,000 The project is located at the: St. Louis (Jefferson Barracks) VA Medical Center 1 Jefferson Barracks Dr. St. Louis, MO 63125 s of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Thomas Council. s shall be submitted only via e-mail to: thomas.council@va.gov. The subject line must read: St. Louis JB - EHRM Infrastructure Upgrades Data Center - Technical s. Oral s of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF S IS March 19, 2025 at 1:00 PM (ET). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Data Centers

$5,688,140.00

Public - Federal

New Construction, Site Work

61

27

37

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Design Data, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Demonstration and Training, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Curing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Wall Finishes, Wall Coverings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment, Parking Control Equipment, Commercial Equipment, Office Equipment, Printers, Foodservice Equipment, Entertainment Equipment, Musical Equipment, Bells, Collection and Disposal Equipment, Solid Waste Handling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Elevators, Escalators and Moving Walks
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Emergency Showers
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Static Uninterruptible Power Supply, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Transient Voltage Suppression, Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Grounding and Bonding for Communications Systems, Identification for Communications Systems, Structured Cabling, Communications Equipment Room Fittings, Communications Termination Blocks and Patch Panels, Communications Cable Management and Ladder Rack, Communications Backbone Cabling, Communications Copper Backbone Cabling, Communications Optical Fiber Backbone Cabling, Communications Horizontal Cabling, Communications Copper Horizontal Cabling, Data Communications, Data Communications Peripheral Data Equipment, Printers
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Derricks, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps, Gas and Liquid Storage, Gas and Liquid Storage Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
42
Bidding Soon
766
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

July 7, 2025

img_map_placeholder

1 Jefferson Barracks Dr, Saint Louis, MO

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

EHRM Infrastructure Upgrades Data Center Construction - St. Louis JB

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.