Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 8, 2025 at 8:00 PM
Updated October 1, 2024
Site work and new construction of a mixed-use development in Saint Louis, Missouri. Completed plans call for the construction of a data center facility; and for site work for a data center facility.
THE CUT-OFF DATE AND TIME FOR RECEIPT OF S IS March 19, 2025 at 1:00 PM (ET). The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion of the EHRM Infrastructure Upgrades Data Center construction project, in accordance with the attached Specifications and Drawings. The St. Louis (Jefferson Barracks) VAMC is seeking a general contractor to furnish all labor, tools, materials, equipment, and supervision to construct a new EHRM Data Center in the Basement of Bldg. 56. The current data center in Bldg. 1 will be relocated to Bldg. 56. The scope of this project includes but not limited to the following infrastructure improvements: Electrical (power (normal, emergency), lighting), Bonding, UPS, Building Management System interfaces, assess for new HVAC, new space construction (walls, doors, finishes), fire suppression system, communication infrastructure (new Data outlets, patch panels, Cat 6A cable), physical security, fiber infrastructure backbone connectivity to MDA. VAAR Magnitude of Construction: $5,000,000 to $10,000,000 The project is located at the: St. Louis (Jefferson Barracks) VA Medical Center 1 Jefferson Barracks Dr. St. Louis, MO 63125 s of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Thomas Council. s shall be submitted only via e-mail to: thomas.council@va.gov. The subject line must read: St. Louis JB - EHRM Infrastructure Upgrades Data Center - Technical s. Oral s of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF S IS March 19, 2025 at 1:00 PM (ET). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Data Centers
$5,688,140.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
July 7, 2025

1 Jefferson Barracks Dr, Saint Louis, MO
Related To This Project
Saint Louis, MO
Bid Date: Dec 28 2022
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Mar 09 2022
Saint Louis, MO
Bid Date: Sep 24 2020
Saint Louis, MO
Bid Date: Apr 12 2022
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Dec 13 2022
Saint Louis, MO
Bid Date: Dec 19 2022
Saint Louis, MO
Bid Date: Dec 29 2022
Saint Louis, MO
--
Saint Louis, MO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Cut Costs, Not Corners.
Get ahead of project risks by targeting the right work early. With detailed construction data at your fingertips, you can pursue jobs that match your margins—and walk away from those that don’t.
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
EHRM Infrastructure Upgrades Data Center Construction - St. Louis JB
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.