EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 18, 2023 at 7:00 PM

Updated January 26, 2024

Site work, paving and new construction of a bridge / tunnel in Indian Grove, Missouri. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The proposed work includes: The construction of a new 203 foot three-span, pre-cast NU35 concrete J-girder bridge with steel H-piling, drilled shafts, concrete abutments, SL-1 railing, traffic control, and all appurtenances. Any questions can be directed to the Design DivisionHistoric Preservation Section, at (573) 751-0473. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 ofthe Missouri Standard Specifications for Highway Construction, 2019 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. No bidder may withdraw his bid within 90 days after the actual date ofthe opening thereof. All questions concerning the bid document preparation can be directed to the Chariton County Commission at 660-288- 3200. Project specific questions can be directed to Howe Company, LLC at 660-395-4693. Special Needs: If you have special needs addressed by the Americans with Disabilities Act, please notify the County Clerk at 660-288-3273 at least 5 working days prior to the bid opening you plan to attend. The wage rates applicable to this project have been predetermined as required by law and are set forth in the bid proposal. When Federal wage rates are applicable and included, this contract is subject to the "Work Hours Act of 1962" (P.L. 87-581; Stat. 357) and implementing regulations. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109, and E.O. 11246 The County of Chariton hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2019 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Contractors and subcontractors who sign a contract to work on public works projects must provide a 10-hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. The shipping and handling charges will be waived if the prospective bidder contacts the Engineer with a valid account number for shipping services with United Parcel Service (UPS), so the shipping cost is billed to the bidder. Hard copies of the bid documents can be ordered by calling 660-395- 4693. A PDF version of the bid documents may be obtained from site. for a nonrefundable fee of $50.00 paid through PAYPAL. Bidders must obtain their bid documents from either Howe Company, LLC, or site and be plan holders in order to bid the project. All proposals must be on the forms provided in the bid documents. The right is reserved to reject any or all bids. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The DBE goal for this project is 5%. No 2"c tier subcontracting will be allowed on this project. The Contract, if awarded, will be awarded to the lowest responsive, responsible bidder who provides the lowest price complying with the Conditions of the Contract Documents within the Owner's budget.

Award

Bridges / Tunnels

$1,666,816.00

Public - County

New Construction, Paving, Site Work

43

10

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Steel Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
28
Bidding Soon
358
All Active Projects
151
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2023

January 10, 2023

img_map_placeholder

Multiple Locations, Indian Grove, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.