Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 27, 2022 at 7:00 PM
Updated January 26, 2024
Site work and paving for a bridge / tunnel in McCleary, Washington. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The Chehalis Basin Fisheries Task Force (CBFTF) is soliciting bids for (3) concrete bridges for the Middle Fork Wildcat Creek. They are in close proximity of each other, just north of McCleary, Grays Harbor County, WA. The bridges are scheduled for installation starting July 10, 2023. All bridges must be ready to be delivered by the July 10, 2023 starting date, but the sequence of delivery must be worked out with the winning bridge provider.
Post-Bid
Bridges / Tunnels
$200,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2022
January 19, 2023
Multiple Locations, McCleary, WA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
