BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Santa Clara, Utah. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Each sealed envelope containing a Bid must be plainly marked on the outside Santa Clara Canyon View Park BMX Parking Lot Project The Bid includes furnishing all labor, materials, transportation, and services to construct approximately 80,000 square feet of paved parking lot, trail, and access road; grading and drainage improvements; sidewalk; and landscaping. Technical questions regarding the Project shall be directed to Jared Bates, PE, Project Engineer, Rosenberg Associates, 352 East River Drive, Suite A-2, St. George, Utah, 84790, (435) 673-8586 jaredb@racivil.com. A 100% performance, labor and materials bond will be required on this project. Every Bid shall be accompanied by a bid bond in the amount of 5% of the bid, naming Santa Clara City as Owner. Bonds must be issued by a surety company licensed to do business in the State of Utah and be on a bond form acceptable to Santa Clara City. Santa Clara City reserves the right to reject any, or all bids, or to waive any formality or technicality in any bid, in the interest of the Owner. Completion Date: 90 Calendar Days

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

10

7

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
11
Bidding Soon
176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2023

February 6, 2023

Project location map

1400 N Canyon View Dr, Santa Clara, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.